Failure to follow the instruction below for the installation of a work tool may result in personal injury or death. Special care must be taken if more than one person is installing the work tool.
|
NOTICE |
---|
To facilitate removal of the bucket pins without causing damage to the pins, the bearings, and/or the O-ring seals put the bucket on the floor and the stick in a vertical position, as shown. |
- Start the engine. Park the machine on a hard, level surface. Position the bucket, the stick, and the bucket control linkage, as shown. Shut off the engine.
Show/hide table
Illustration 2 g01303452 - Slide O-ring seals (1) off the pin joints and onto the flanges of the bucket.
Show/hide table
When the pin assembly is removed, the linkage assembly may swing out of the bucket. To prevent possible personal injury, do not stand in front of the linkage assembly when the pin assembly is being removed.
Note: Removing the support pin may be difficult due to excessive pressure on the support pin. Remove the pressure on the support pin by adjusting the front linkage.
Show/hide tableIllustration 3 g01303433 - Remove bolts (2) and retaining plates (3). Then remove support pin (4) and support pin (5).
- Start the engine and raise the stick out of the bucket.
- Remove the O-ring seals (1) from the flanges on the bucket.
![]() | |
Illustration 1 | g02280104 |
Note: After the support pins have been removed, make sure that the support pins do not become contaminated with sand or dirt. Make sure that the seals on the end of the stick and the seals on the end of the link do not become damaged.
- Clean each pin and each pin bore. Lubricate each pin bore with molybdenum grease.
Show/hide table
Illustration 4 g01303452 - Position the O-ring seals (1) onto the flanges of the bucket.
- Start the engine and lower the stick into the bucket until the pin bores are in alignment with each other. Stop the engine.
Show/hide table
Illustration 5 g01303433 - Insert support pin (5) into the pin bore. Make sure that the flange of the support pin rest inside the support on the side of the bucket.
- Refer to Operation and Maintenance Manual, "Bucket Linkage - Inspect/Adjust" in order to adjust the bucket clearance.
- Install retaining plate (3). Install bolts (2). Tighten bolts (2) evenly.
- Slide O-ring seals (1) in position over the pin joints between the bucket and the stick.
- Start the engine and position the bucket linkage into the bucket until the pin bores are in alignment with each other. Stop the engine.
- Insert support pin (4) into the pin bore. Make sure that the flange of the support pin rest inside the support on the side of the bucket.
- Install retaining plate (3). Install bolts (2). Tighten bolts (2) evenly.
- Slide the O-ring seals (1) over the pin joints between the bucket and the link assembly.
- Lubricate the bucket pins. Refer to Operation and Maintenance Manual, "Bucket Linkage - Lubricate" or Operation and Maintenance Manual, "Boom, Stick, and Bucket Linkage - Lubricate".
![]() |
Failure to follow the instruction below for the installation of a work tool may result in personal injury or death. Special care must be taken if more than one person is installing the work tool.
|
NOTICE |
---|
To facilitate removal of the bucket pins without causing damage to the pins, the bearings, and/or the O-ring seals put the bucket on the floor and the stick in a vertical position, as shown. |
- Start the engine. Park the machine on a hard, level surface. Position the bucket, the stick, and the bucket control linkage, as shown. Shut off the engine.
Show/hide table
Illustration 7 g01303567 - Slide O-ring seals (6) off the pin joints and onto the flanges of the bucket.
Show/hide table
When the pin assembly is removed, the linkage assembly may swing out of the bucket. To prevent possible personal injury, do not stand in front of the linkage assembly when the pin assembly is being removed.
Note: Removing the support pin may be difficult due to excessive pressure on the support pin. Remove the pressure on the support pin by adjusting the front linkage.
Show/hide tableIllustration 8 g01303568 - Remove bolt (7). Remove support pin (8).
- Remove bolt (10). Remove support pin (9).
- Start the engine and raise the stick out of the bucket.
- Remove the O-ring seals (6) from the flanges on the bucket.
![]() | |
Illustration 6 | g02280104 |
Note: After the support pins have been removed, make sure that the support pins do not become contaminated with sand or dirt. Make sure that the seals on the end of the stick and the seals on the end of the link do not become damaged.
- Clean each pin and each pin bore. Lubricate each pin bore with molybdenum grease.
Show/hide table
Illustration 9 g01303567 - Position the O-ring seals (6) onto the flanges of the bucket.
Show/hide table
Illustration 10 g01303568 - Start the engine and lower the stick into the bucket until the pin bores are in alignment with each other. Stop the engine.
- Install support pin (9) into the pin bore.
- Install bolt (10).
- Refer to Operation and Maintenance Manual, "Bucket Linkage - Inspect/Adjust" in order to adjust the bucket clearance.
- Slide O-ring seals (6) in position over the pin joints between the bucket and the stick.
- Start the engine and position the bucket linkage into the bucket until the pin bores are in alignment with each other. Stop the engine.
- Install support pin (8) into the pin bore.
- Install Bolt (7).
- Slide the O-ring seals (6) over the pin joints between the bucket and the link assembly.
- Lubricate the bucket pins. Refer to Operation and Maintenance Manual, "Bucket Linkage - Lubricate" or Operation and Maintenance Manual, "Boom, Stick, and Bucket Linkage - Lubricate".
![]() |
Failure to follow the instruction below for the installation of a work tool may result in personal injury or death. Special care must be taken if more than one person is installing the work tool.
|
NOTICE |
---|
To facilitate removal of the bucket pins without causing damage to the pins, the bearings, and/or the O-ring seals put the bucket on the floor and the stick in a vertical position, as shown. |
- Start the engine. Park the machine on a hard, level surface. Position the bucket, the stick, and the bucket control linkage, as shown. Shut off the engine.
Show/hide table
Illustration 12 g01303581 - Slide O-ring seals (11) off the pin joints and onto the flanges of the bucket.
Show/hide table
When the pin assembly is removed, the linkage assembly may swing out of the bucket. To prevent possible personal injury, do not stand in front of the linkage assembly when the pin assembly is being removed.
Note: Removing the support pin may be difficult due to excessive pressure on the support pin. Remove the pressure on the support pin by adjusting the front linkage.
Show/hide tableIllustration 13 g01303622 - Remove nuts and retaining bolt (12) from support pin (13). Remove support pin (13).
- Remove bolts (15) and adapter plate (14). Remove the shims.
- Remove nuts and retaining bolt (17) from support pin (16). Remove support pin (16).
- Start the engine and raise the stick out of the bucket.
- Remove the O-ring seals (11) from the flanges on the bucket.
![]() | |
Illustration 11 | g02280104 |
Note: After the support pins have been removed, make sure that the support pins do not become contaminated with sand or dirt. Make sure that the seals on the end of the stick and the seals on the end of the link do not become damaged.
- Clean each pin and each pin bore. Lubricate each pin bore with molybdenum grease.
Show/hide table
Illustration 14 g01303581 - Position the O-ring seals (11) onto the flanges of the bucket.
- Start the engine and lower the stick into the bucket until the pin bores are in alignment with each other. Stop the engine.
Show/hide table
Illustration 15 g01303622 - Install support pin (16). Put the retaining bolt hole that is in support pin (16) in alignment with the retaining bolt hole that is in the bucket.
- Install the retaining bolt and nuts (17). Install adapter plate (14) without the shims, and without bolts (15) that hold adapter plate (14).
- Refer to Operation and Maintenance Manual, "Bucket Linkage - Inspect/Adjust" in order to adjust the bucket clearance.
- Slide O-ring seals (11) in position over the pin joints between the bucket and the stick.
- Start the engine and position the bucket linkage into the bucket until the pin bores are in alignment with each other. Stop the engine.
- Install support pin (13). Put the retaining bolt hole that is in the bucket pin in alignment with the retaining bolt hole that is in the bucket.
- Install the retaining bolt and nuts (12).
- Slide the O-ring seals (11) over the pin joints between the bucket and the link assembly.
Show/hide table
Illustration 16 g00510030 - Tighten retaining nuts (12) and (17). Position the outside nut even with the end of the retaining bolt or
0.5 mm (0.02 inch) beyond the end of the retaining bolt. Tighten the inside nut against the outside nut. - Lubricate the bucket pins. Refer to Operation and Maintenance Manual, "Bucket Linkage - Lubricate" or Operation and Maintenance Manual, "Boom, Stick, and Bucket Linkage - Lubricate".