VT-30, VT-40, VT-50 and VT-60 Multi-Processors Cutting Edges - Inspect/Replace Caterpillar


Cutting Edges - Inspect/Replace
`
VT-30, VT-40, VT-50 and VT-60 Multi-Processors [SEBU7751]
WORK TOOLS
BUCKET GP
VT-30, VT-40, VT-50 and VT-60 Multi-Processors Cutting Edges - Inspect/Replace
1.1. Inspect the Cutting Edges
2.1. Replace the Cutters

Inspect the Cutting Edges

  1. Open the jaws of the work tool.

  1. Lock the jaws in an open position. Refer to, "Crusher Tooth and Ripper Tooth - Replace" for the proper procedure.



    Illustration 1g02150133

    Typical example

  1. Inspect the cutting edges on the cutters (1) for wear. If the cutting edge is worn or if the cutter is damaged, the cutting edge must be changed or the cutter must be replaced.

  1. Inspect the current cutting edge on the cutter. Inspect the other cutting edges on the cutter. Each cutter has four edges that can be used.

  1. Inspect the radius of the cutting edge on the cutter. If the radius of the cutting edge is greater than 5 mm (0.2 inch), the cutting edge must be changed or the cutter must be replaced.

  1. If the other cutting edge on the same side is not worn, rotate the cutter and install the cutter. If the other cutting edge is worn, turn the opposite side of the cutter outward and install the cutter.

If all of the cutting edges are worn, the cutters must be replaced.

Replace the Cutters

  1. Open the jaws of the work tool.

  1. Lock the jaws in an open position. Refer to, "Crusher Tooth and Ripper Tooth - Replace" for the proper procedure.



    Illustration 2g02150134

    Typical example

  1. In order to replace the cutters (1), remove screws (2), shims (3) and cutters (1) from the work tool.

  1. Thoroughly clean all contact surfaces before installing the new cutters. Remove any rust, paint, nicks, and burrs from the surfaces.

  1. Install the shims (3) and install the new cutters (1) .

  1. Install screws (2). Tighten the screws to the proper torque. Refer to, "General Maintenance Information" for the proper torque value.

    Note: Use new screws when the cutter will be replaced.

  1. Slowly close the jaws on the work tool.

  1. Measure the clearance between the cutter (1) of the movable jaw and the cutter (1) of the fixed jaw. The clearance between the two cutters must be less than 0.5 mm (0.02 inch). Use the shims (3) to adjust the amount of clearance.

    Note: On the shear jaw sets, the clearance between the guide blade and cutter of the fixed jaw must also be checked.

    Note: The cutting edge and guide blades must be in front of the base material in order to reduce the wear of the base material.

Information System:

VT-30, VT-40, VT-50 and VT-60 Multi-Processors Crusher Tooth and Ripper Tooth - Tighten
VT-30, VT-40, VT-50 and VT-60 Multi-Processors Crusher Tooth and Ripper Tooth - Replace
VT-30, VT-40, VT-50 and VT-60 Multi-Processors Bushings - Lubricate
VT-30, VT-40, VT-50 and VT-60 Multi-Processors Transport Position
VT-30, VT-40, VT-50 and VT-60 Multi-Processors Operation
VT-30, VT-40, VT-50 and VT-60 Multi-Processors Work Tool Installation and Removal
VT-30, VT-40, VT-50 and VT-60 Multi-Processors Daily Inspection
VT-30, VT-40, VT-50 and VT-60 Multi-Processors Declaration of Conformity
VT-30, VT-40, VT-50 and VT-60 Multi-Processors Plate Locations and Film Locations
VT-30, VT-40, VT-50 and VT-60 Multi-Processors Specifications
345C MHPU Mobile Hydraulic Power Unit Hydraulic System Relief Valve (Auxiliary) - Test and Adjust - Main (Medium Pressure), System 17
345C MHPU Mobile Hydraulic Power Unit Hydraulic System Relief Valve (Auxiliary) - Test and Adjust - Line, System 17
VT-30, VT-40, VT-50 and VT-60 Multi-Processors Jaw - Repair
VT-30, VT-40, VT-50 and VT-60 Multi-Processors Rotator Gear - Lubricate
VT-30, VT-40, VT-50 and VT-60 Multi-Processors Rotator Head Bolts - Check
VT-30, VT-40, VT-50 and VT-60 Multi-Processors Rotator Head Bolts - Check
VT-30, VT-40, VT-50 and VT-60 Multi-Processors Rotator Head Bolts - Check
VT-30, VT-40, VT-50 and VT-60 Multi-Processors Rotator Head Bolts - Inspect
VT-30, VT-40, VT-50 and VT-60 Multi-Processors Rotator Head Bolts - Inspect
VT-30, VT-40, VT-50 and VT-60 Multi-Processors Wear Plates - Inspect/Replace
VT-30, VT-40, VT-50 and VT-60 Multi-Processors Wear Tip - Inspect/Replace
VT-30, VT-40, VT-50 and VT-60 Multi-Processors Maintenance Interval Schedule
325 VM and VH Variable Gauge Undercarriage Front Idler, Recoil Spring and Hydraulic Track Adjuster - Remove and Install
326F Excavator Hydraulic System Oil Filter (Pilot) - Replace