Illustration 1 | g02176425 |
NOTICE |
---|
Improper lifting and improper tie-downs can allow the load to shift and cause injury or damage. |
Note: The shipping weight that is listed is the weight of the most common configuration of the machine. If attachments have been installed on your machine, the weight of your machine and the center of gravity of your machine may vary.
Refer to the Operation and Maintenance Manual, "Specifications" for specific weight information.
- Use correctly rated cables and slings for lifting. The crane should be positioned so that the machine is lifted parallel to the ground.
- To prevent contact with the machine, lifting cables should have sufficient length.
- The width of the spreader bar and the strength of the spreader bar should be sufficient to prevent contact with the machine.
When the wire cables are lifted, the wire cables should slide to front track rollers and to the rear track rollers.
- Move the lever for the hydraulic lockout control to the LOCKED position.
Note: Never use the step when the machine is lifted.
![]() | |
Illustration 2 | g01577714 |
(1) Sleeve
(2) Bolts (3) Pin (4) Nuts |
Install pin (3) and install sleeve (1) in the brackets of the bucket. The previous illustration indicates the method to secure pin (3) with bolts (2) and nuts (4). Fasten two proper rated wire cables to pin (3).