20Nov2007 |
After Failure Only Parts stock action needed | PRODUCT SUPPORT PROGRAM FOR REPLACING THE TAPERED PIN AND RELATED HARDWARE FOR THE LOWER SWING FRAME ON CERTAIN 416E, 420E AND 430E BACKHOE LOADERS |
|
6506 | PS51398 |
NOTE: | This Program can only be administered after a failure occurs. The decision whether to apply the Program is made by the dealer. When reporting the repair, use "PS51398" as the Part Number and "7755" as the Group Number. Use "96" as the Warranty Claim Description Code and use "Z" as the SIMS Description Code. |
NOTE: | Although this Program is to be administered as described above on the Affected Product, parts should be removed from parts stock as soon as possible. |
NOTE: | The information supplied in this service letter may not be valid after the termination date of this program. Do not perform the work outlined in this Service Letter after the termination date without first contacting your AVSpare product analyst. |
TERMINATION DATE |
30Nov2009 |
PROBLEM
The 130-0484 and 9R-0234 Tapered Pin for the lower swing frame joint may prematurely fail on certain 416E, 420E and 430E Backhoe Loaders. An improved tapered pin is available. |
AFFECTED PRODUCT
Model | Identification Number |
416E | CBD00940-02307 SHA00116-02225 |
420E | HLS00210-03604 KMW00150-01555 |
430E | DDT00220-00504 EAT00230-00802 |
PARTS NEEDED
Qty |
Part Number | Description |
1 | 3B8489 | FITTING |
1 | 8T3652 | NUT |
1 | 8T4837 | WASHER-PLATED |
1 | 3005440 | PIN |
In Order to allow equitable parts availability to all participating dealers, please limit your initial parts order to not exceed 3% of dealership population. This is an inital order recommendation only, and the ultimate responsibility for ordering the total number of parts needed to satisfy the program lies with the dealer. |
ACTION REQUIRED
Remove all 130-0484 Pins from dealer parts stock. |
A new 300-5440 Pin has improved fatigue life by increasing the heat treatment area and also the radius at the thread base was increased to 3mm. Refer to the attached Rework Procedure. |
SERVICE CLAIM ALLOWANCES
Submit one claim for all parts removed from dealer parts stock. |
0-24 mo |
||||||
25-48 mo |
NOTE: This is a 2.0-hour job | ||||||
PARTS DISPOSITION
Handle the parts in accordance with your Warranty Bulletin on warranty parts handling. |
Handle the parts in accordance with your Warranty Bulletin on warranty parts handling. |
Refer to Disassembly and Assembly Manual, RENR6485, "Swing Frame-Install". Note: When installing the new pin, the taper pin bore must be cleaned with degreaser to remove grease or protective coatings. The bore and taper area of the pin then must be cleaned with isopropyl alcohol prior to assembly. Tighten the lower swing frame pin nut to a torque of 1250 +/- 135 Nm (922 +/- 100 lb ft). Place the rear implements in the position shown below in Image 1.1.1 to apply torque to the nut. Note: The swing frame lock pin must be installed when applying torque to the nut. |
![]() |
Image1.1.1 |
Cycle the swing cylinders 10 times with the backhoe positioned as shown in Image 1.2.1. Cycle the swing cylinders without hitting the frame with the swing casting. |
![]() |
Image1.2.1 |
Cycle the stick cylinder 10 times with the backhoe positioned as shown in Image 1.3.1. |
![]() |
Image1.3.1 |
Cycle the boom cylinder 10 times with the backhoe positioned as shown in Image 1.4.1. Cycle the boom cylinder through the snubber when raising the boom. |
![]() |
Image1.4.1 |
Re-tighten the lower swing frame pin nut to a torque of 1250 +/-135 Nm (922 +/- 100 lb ft). Place the rear implements in the position shown in Image 1.1.1 to apply torque to the nut. Note: The swing frame lock pin must be installed when applying torque to the nut. |