Specification

Table 1
"Relief Valve (Main) - Test and Adjust" 
Machine Settings  Engine Speed 
Speed Dial "10"
AEC switch OFF
Item  Specification  Actual 
Standard  35000 ± 500 kPa (5076 ± 73 psi)   
Heavy Lift  38000 ± 500 kPa (5512 ± 73 psi)   

Introduction

The main relief valve is located in the front side of the main control valve toward the bottom. The main relief valve is accessible from below the machine after removal of the access plate. The main relief valve limits the maximum operating pressure of the travel hydraulic circuit and the implement hydraulic circuits when the machine is at a load condition. Machines that are equipped with heavy lift have a high-pressure setting and a low-pressure setting for the main relief valve.



Illustration 1g03688931
Main relief valve location on main control valve

Required Tools



Illustration 2g01623868
Tooling group "B"
198-4240 Digital Pressure Indicator Gp

Table 2
Tool  Item  Part Number  Description  Qty 
198-4240  Digital Pressure Indicator Gp   
  B1  198-4234  Indicator 
B2 198-4239  Pressure Sensor 41,368 kPa (6,000 psi) 
B3 198-4236  Extension Cable 

Machine Preparation

  1. Position the machine on level ground and stop the engine.

  2. Release the pressure in the hydraulic system. Refer to Testing and Adjusting, "System Pressure - Release".


    Illustration 3g03862183
    Pressure tap for the drive pump

  3. Attach a 41,368 kPa (6,000 psi) pressure sensor to the pressure tap for the drive pump.

Test Procedure

Standard

  1. Start the engine.

  2. Place the hydraulic activation control lever in the UNLOCKED position.

  3. Place the machine controls at the following settings: engine speed dial "10" and AEC switch OFF. Refer to Testing and Adjusting, "Engine Performance - Test (Engine Speed)" for engine rpm settings.

  4. Increase the hydraulic oil temperature to 55° ± 5°C (131° ± 9°F).

  5. Move the joystick for the bucket until the bucket is at the full BOOM RAISE position (full extension of the boom cylinders).

  6. Check the pressure reading for the main relief valve pressure setting. Refer to Table 1.

  7. Return the joystick for the boom to the NEUTRAL position.

Heavy Lift

Note: Machines that are equipped with heavy lift have a high-pressure setting and a low-pressure setting for the main relief valve.

  1. Start the engine.

  2. Place the hydraulic activation lever to the UNLOCK position.

  3. Place the machine controls at the following settings: engine speed dial "10" and AEC switch OFF. Refer to Testing and Adjusting, "Engine Performance - Test (Engine Speed)" for engine rpm settings.

  4. Increase the hydraulic oil temperature to 55° ± 5°C (131° ± 9°F).


    Illustration 4g02062913
    Switch for heavy lift

  5. Set the switch for heavy lift to the OFF position. The indicator light should not be illuminated.

  6. Move the joystick for the bucket until the bucket is at the full BUCKET CLOSE position (full extension of bucket cylinder).

  7. Check the pressure reading for the main relief valve pressure setting. Refer to Table 1.

  8. Return the joystick for the bucket to the NEUTRAL position.


    Illustration 5g02061934
    Switch for heavy lift

  9. Set heavy lift switch (A) to the ON position. Make sure that the indicator light is on.

  10. Move the joystick for the boom until the boom is at the full BOOM RAISE position (full extension of boom cylinders).

  11. Check the pressure reading for the setting for heavy lift of the main relief valve. Refer to Table 1.

  12. Return the joystick for the boom to the NEUTRAL position.

Adjustment Procedure

Standard

  1. Remove the access plate below the main control valve to locate the main relief valve.


    Illustration 6g02102305
    Main relief valve
    (A) Adjustment screw
    (L) Locknut

  2. Loosen locknut (L).

  3. Move the joystick for the bucket until the bucket is at the full BUCKET CLOSE position (full extension of the bucket cylinder).

  4. Check the pressure reading for the main relief valve pressure setting. Refer to Table 1.

  5. Return the joystick for the bucket to the NEUTRAL position.

  6. Adjust the pressure setting for the main relief valve to the specification.

    Note: Turn adjustment screw (A) clockwise to increase the pressure. Turn adjustment screw (A) counterclockwise to decrease the pressure.

    Note: Always make final pressure adjustments on pressure rise.

  7. Tighten locknut (L). Do not allow adjustment screw (A) to move.

Heavy Lift



Illustration 7g02061719
Main relief valve (heavy lift)
(LH) Locknut for heavy lift
(AH) Adjustment screw for heavy lift
(LM) Locknut for main relief
(AM) Adjustment screw for main relief


Illustration 8g03737052
Cutaway of the Main Relief Valve (Heavy Lift)
(LH) Locknut for heavy lift
(AH) Adjustment screw for heavy lift
(LM) Locknut for main relief
(AM) Adjustment screw for main relief

When the main relief pressure setting is adjusted, the pressure setting for heavy lift is not affected. When adjustment screw (AM) is turned counterclockwise to decrease the main relief setting, the pressure difference between the main relief setting and the pressure setting for heavy lift will increase. When adjustment screw (AM) is turned clockwise to increase the main relief setting, the pressure difference between the main relief setting and the pressure setting for heavy lift will decrease.

When the pressure setting for heavy lift is increased, the main relief setting is also increased. When the pressure setting for heavy lift is decreased, the main relief setting is also decreased. The relief valve pressure setting for heavy lift and the relief pressure setting for the main relief are shown in Table 1.

  1. Remove the access plate below the main control valve to locate the main relief valve.


    Illustration 9g02061934
    Switch for heavy lift

  2. Heavy lift switch (A) must be set to the ON position. Make sure that the indicator light is on.

  3. Loosen locknut (LM). Turn adjustment screw (AM) clockwise until the adjustment screw stops.

  4. Tighten locknut (LM).

  5. Loosen locknut (LH).

  6. Move the joystick for the boom until the boom is at the full BOOM RAISE position (full extension of boom cylinders).

  7. Check the pressure reading for the setting for heavy lift of the main relief valve. Refer to Table 1.

  8. Return the joystick for the boom to the NEUTRAL position.

  9. Adjust the pressure setting for heavy lift to the specification. Turn the adjustment screw (AH) clockwise to increase the pressure. Turn the adjustment screw (AH) counterclockwise to decrease the pressure. Refer to Table 1.

    Note: Always make final pressure adjustments on pressure rise.

  10. Tighten locknut (LH). Do not allow adjustment screw (AH) to move.


    Illustration 10g02062913
    Switch for heavy lift

  11. Set heavy lift switch (A) to the OFF position. The indicator light should not be illuminated.

  12. Loosen locknut (LM).

  13. Move the joystick for the bucket until the bucket is at the full BUCKET CLOSE position (full extension of the bucket cylinder).

  14. Check the pressure reading for the setting for heavy lift of the main relief valve. Refer to Table 1.

  15. Return the joystick for the bucket to the NEUTRAL position.

  16. Adjust the main relief pressure setting to the specification by turning adjustment screw (AM) counterclockwise. Refer to Table 1.

    Note: Always make final pressure adjustments on pressure rise.

  17. Tighten locknut (LM). Do not allow adjustment screw (AM) to move.

    Note: If the pilot line for heavy lift prevents proper adjustment of the relief valve settings, the line can be removed to make the adjustments. The machine will need to be off and the hydraulic system pressure will need to be released to remove the pilot line for heavy lift. Make adjustments to the relief valves and reconnect the pilot line before starting the machine and checking the pressure settings.

Information System:

558 Forest Machine Machine Systems Solenoid Valve (Proportional Reducing) - Calibrate - Power Shift Pressure
PM620, PM622, PM820, PM822 and PM825 Cold Planers Electronic System Event Codes
336D 2L and 340D 2L Excavators Machine Systems Solenoid Valve (Negative Flow Control, Proportional Reducing Valve) - Remove and Install
Installation Procedure for Front Mounted IT Quick Couplers on Certain 427F2, 428F2, and 434F2 Backhoe Loaders {6129}
A New Upper Frame Design is Now Used for Improved Magnet Cable Routing on Certain 320E Excavators {1408, 7051}
Tiltable Ditch Cleaning Buckets Work Tool Installation and Removal
Tiltable Ditch Cleaning Buckets Safety Messages
GSV520 and GSV525 Orange Peel Grapples Hydraulic Cylinder - Assemble
PM620, PM622, PM820, PM822 and PM825 Cold Planers Electronic System Determining Diagnostic Trouble Codes
329F and 330F Excavators Hydraulic System Auxiliary Pump Flow - Test
303.5E2 CR, 304E2 CR, 304.5E2 XTC, 305E2 CR and 305.5E2 CR Mini Hydraulic Excavators Hydraulic System Relief Valve (Pilot) - Test and Adjust
538 Forest Machine Machine Systems Engine Performance - Test - Engine Speed
725C, 725C2, 730C, 730C2 and 730C, 730C2 EJECTOR Articulated Truck Systems Differential
336D 2L and 340D 2L Excavators Machine Systems Main Control Valve - Remove and Install
538 Forest Machine Machine Systems Swing Motor - Test - Measurement of Case Drain Oil
Procedure for Reinforcing Bracket As on Certain M Series Motor Graders {6158, 6159}
Debris in Oil System Causing Repeat Failures of the (HEUI) Pump for Certain C7 and C9 Engines. {1126, 1251, 1318, 1378}
325F Excavator Engine Supplement Diesel Exhaust Fluid Pump - Remove and Install
538 Forest Machine Machine Systems Relief Valve (Swing) - Test and Adjust
725C, 725C2, 730C, 730C2 and 730C, 730C2 EJECTOR Articulated Truck Systems Final Drive and Wheel
336D 2L and 340D 2L Excavators Machine Systems Gear Pump (Pilot) - Remove and Install
308E2 CR, 308E2 SR Mini Hydraulic Excavator Diagnostic Trouble Codes
538 Forest Machine Machine Systems Travel Motor - Test - Measurement of Case Drain Oil
336D 2L and 340D 2L Excavators Machine Systems Pressure Reducing Valve (Implement and Swing Priority) - Remove and Install