Introduction

Use the following procedure in order to measure the case drain of the swing motor.


NOTICE

Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting, and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids.

Refer to Special Publication, NENG2500, "Dealer Service Tool Catalog" for tools and supplies suitable to collect and contain fluids on Cat products.

Dispose of all fluids according to local regulations and mandates.


Required Tools



Illustration 1g01623868
Tooling group "B"
198-4240 Digital Pressure Indicator Gp

Table 1
Tool  Item  Part Number  Description  Qty 
198-4240  Digital Pressure Indicator Gp   
  B1  198-4234  Indicator 
B2 198-4239  Pressure Sensor 41,368 kPa (6,000 psi) 
B3 198-4236  Extension Cable 
D1  6V-7788  Flow Meter
5 to 60 L/min (2 to 15 US gpm) 
D2 8C-6874  Connector 
D3 6V-9746  O-Ring Seal 
D4 124-1921  Permanent Coupling 
D5 122-6872  Bulk Hydraulic Hose  3 ft 
D6 124-2153  Permanent Coupling 
311-1362  Vacuum Cap 

Machine Preparation - 568 GF

  1. Stop the engine.

  2. Release the pressure in the hydraulic system. Refer to Testing and Adjusting, "Hydraulic System Pressure - Release".

  3. Attach 311-1362 Vacuum Cap onto the hydraulic tank. Attach an air supply hose onto the assembly. Apply 276 to 414 kPa (40 to 60 psi). This procedure will pull a vacuum on the hydraulic system.


    Illustration 2g02414697
    Flow Meter Tool Layout
    (1) Swing motor
    (2) Case drain hose
    (3) Elbow
    (4) Swivel
    (D1) Flow meter
    (D2) Connector
    (D3) O-Ring seal
    (D4) Permanent coupling
    (D5) Hose
    (D6) Permanent coupling

  4. Install the following tools in accordance with the flow meter tool layout. Refer to Illustration 2.

  5. Disconnect case drain hose (2) from elbow (3).

  6. Connect the flow meter assembly (D) between elbow (3) and case drain hose (2).

    Note: Correct orientation of the flow meter is necessary. The oil flows from swing motor (1) to swivel (4).

  7. Remove 311-1362 Vacuum Cap.


    Illustration 3g02072074
    Pilot Manifold
    (5) Solenoid valve for swing parking brake
    (6) Connector

  8. Disconnect connector (6) from the solenoid valve for swing parking brake (5).

Machine Preparation - 568 LL

  1. Position the machine on level ground.

  2. Stop the engine.

  3. Release the pressure in the hydraulic system. Refer to Testing and Adjusting, "System Pressure - Release".

  4. Attach 311-1362 Vacuum Cap onto the hydraulic tank. Attach an air supply hose onto the assembly. Apply 276 to 414 kPa (40 to 60 psi). This procedure will pull a vacuum on the hydraulic system.


    Illustration 4g02148661
    (1) Right swing motor
    (2) Left swing motor
    (3) Elbow
    (4) Connector
    (5) Case drain hose
    (6) Tee
    (7) Swivel

  5. Disconnect case drain hose (5) from elbow (3) to test the right swing motor. Disconnect tee (6) from connector (4) to test the left swing motor.


    Illustration 5g02148669
    Flow Meter Tool Layout
    (1) Right swing motor
    (2) Left swing motor
    (3) Elbow
    (4) Connector
    (5) Case drain hose
    (6) Tee
    (7) Swivel
    (D1) Flow Meter
    (D2) Connector
    (D3) O-Ring seal
    (D4) Permanent coupling
    (D5) Hose
    (D6) Permanent coupling

  6. Install the following tools in accordance with the flow meter tool layout. Refer to Illustration 5.

  7. Connect the flow meter assembly (D) between elbow (3) and case drain hose (5) to test the right swing motor. Connect the flow meter assembly (D) between tee (6) and connector (4).

    Note: Correct orientation of the flow meter is necessary. The oil flows from the swing motor.

  8. Remove 311-1362 Vacuum Cap.


    Illustration 6g02148684
    Pilot Manifold
    (8) Solenoid valve for swing parking brake
    (9) Connector

  9. Disconnect connector (9) from the solenoid valve for swing parking brake (8).

Test Procedure

  1. Start the engine.

  2. Place the machine controls at the following settings: engine speed dial "10" and AEC switch OFF. Refer to Testing and Adjusting, "Engine Performance - Test (Engine Speed)" for engine rpm settings.

  3. Place the hydraulic activation control lever in the UNLOCKED position.

  4. Increase the hydraulic oil temperature to 50° ± 10°C (122° ± 18°F).

  5. Slowly move the swing joystick and make sure that the swing brake is activated.

  6. Move the swing joystick fully for 1 minute. Measure the case drain oil. Refer to Table 2.

  7. Stop the engine.

  8. Connect connector (6) to the solenoid valve for the swing parking brake (5).

  9. Repeat this test procedure three times in order to obtain three measurements of case drain oil. For each test procedure, swing the upper structure to a different position.

Worksheet

Table 2
"Swing Motor - Test (Measurement of Case Drain Oil)" 
Date  Machine Serial Number 
Machine Settings  Swing Relief Pressure  Engine Speed 
31400 ± 1000 kPa (4554 ± 145 psi) Engine speed dial "10"
AEC Switch OFF 
Item  Specification(1)  Actual 
New Swing Motor  30 L/min (7.9 US gpm)  1. 
2.
3.
Rebuilt Swing Motor  35 L/min (9.2 US gpm)  1. 
2.
3.
(1) Maximum acceptable flow

Information System:

568 Forest Machine Hydraulic System Relief Valve (Line) - Test and Adjust
336E Excavator and 336E MHPU Mobile Hydraulic Power Unit C9.3 Engine Supplement Crankshaft Vibration Damper and Pulley - Remove and Install
336E Excavator and 336E MHPU Mobile Hydraulic Power Unit C9.3 Engine Supplement Water Pump - Remove and Install
336E Excavator and 336E MHPU Mobile Hydraulic Power Unit Machine Systems Bucket Linkage - Remove and Install
349F and 352F Excavators Hydraulic System Relief Valve (Swing) - Test and Adjust
Installation of the 260-7976 Pilot Lines Gp on Certain 320Dand 323D Excavators{5057, 5059}
C13 Engines for Caterpillar Built Machines Exhaust Combustion Lines
2013/08/29 Data for the Engine and Power Train for Series E Backhoe Loaders {0374, 1000, 3101, 7000}
374D Excavator Plate Locations and Film Locations
Removal and Installation of Unit Injectors on 3114, 3116, and 3126 MUI Engines{1251, 1290}
349F and 352F Excavators Hydraulic System Relief Valve (Line) - Test and Adjust
349E Excavator Hydraulic System Swing Hydraulic System
568 Forest Machine Hydraulic System Relief Valve (Swing) - Test and Adjust
568 Forest Machine Hydraulic System Specifications
Installation of the 281-8245 Auxiliary Hydraulic Lines Gp on Certain Hydraulic Excavators {5057, 5057}
336E Excavator and 336E MHPU Mobile Hydraulic Power Unit C9.3 Engine Supplement Crankshaft Front Seal - Remove and Install
330D and 336D Excavators and 336D Mobile Hydraulic Power Units Maintenance Interval Schedule
568 Forest Machine Hydraulic System Operational Checks
568 Forest Machine Hydraulic System Travel on Level Ground - Test
568 Forest Machine Hydraulic System Travel on Level Ground - Test - Optional Test
568 Forest Machine Hydraulic System Swing Speed and Overswing on Level Ground - Check
725C, 725C2, 730C, 730C Ejector, 730C2, 730C2 EJ, 735B, 735C, 740B, 740B Ejector, 740C Ejector and 745C Articulated Trucks VIMSTM 3G Electrical Connector - Inspect
2010/04/28 Improved Grapple Stick Pins for the G100B Series Contractor Grapples {6307}
336E Excavator and 336E MHPU Mobile Hydraulic Power Unit C9.3 Engine Supplement Refrigerant Compressor - Remove and Install