1.1. Removal Procedure
2.1. Installation Procedure

Removal Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
141-1785  Receiving Sleeve 
137-8460 Puller Stud 
9U-5346 Nut 
6V-3175 Double Acting Cylinder 
3S-6224 Electric Hydraulic Pump Gp 

Start By:

  1. Remove the bucket.


NOTICE

Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting, and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids.

Refer to Special Publication, NENG2500, "Dealer Service Tool Catalog" for tools and supplies suitable to collect and contain fluids on Cat® products.

Dispose of all fluids according to local regulations and mandates.


  1. Start the machine. Fully retract the bucket cylinder. Secure the linkage to the stick.


    Illustration 1g00686746

  2. Fully extend the stick cylinder. Lower the stick to the floor. Block the end of the stick that connects to the boom. Stop the engine.


    Illustration 2g00686722

  3. Place a suitable block under stick cylinder (1).


    Illustration 3g00686768

  4. Remove retaining bolt (2) from pin assembly (3).

    Note: Shims are located between the stick cylinder and the stick at the pin bore.

  5. Remove pin assembly (3) and the spacer from the stick.

  6. Start the machine. Fully retract the stick cylinder. Stop the engine.

  7. Remove the shims that are located between the stick cylinder and the stick at the pin bore.


    Illustration 4g00690283

  8. Position suitable blocks between the stick and the boom, as shown.

  9. Release hydraulic system pressure. Refer to Disassembly and Assembly, "Hydraulic System Pressure - Release".


    Illustration 5g01213221

  10. Disconnect hose assemblies (4). Remove retaining bolt (6) from pin assembly (5). Attach a suitable lifting device to Tooling (A). The weight of Tooling (A) is approximately 136 kg (300 lb). Use Tooling (A) and the suitable lifting device in order to remove pin assembly (5). The combined weight of pin assembly (5) and Tooling (A) is approximately 184 kg (405 lb).

    Note: Shims are located between the boom and stick (7) at the pin bore.

  11. Start the machine. Raise the boom away from stick (7).

    Note: The suitable blocks that are located between stick (7) and the boom will fall when the boom is raised.

  12. Swing the machine so that the boom may be lowered to the floor. Lower the boom to the floor. Stop the engine.

  13. Remove the shims that are located between stick (7) and the boom at the pin bore.

Installation Procedure

Table 2
Required Tools 
Tool  Part Number  Part Description  Qty 
5P-0960  Grease Cartridge 
4C-9485  Pin Driver Cap 

Note: Make sure that the pin bores in the stick and in the boom are thoroughly clean and free of dirt and debris prior to the installation of the stick on the boom.

  1. Put a thin coat of Tooling (B) on the sleeve bearings and on the lips of lip seals.

  2. Start the machine. Raise the boom. Swing the boom over the stick. Align the pin bores for the boom to stick pin.


    Illustration 6g01213260


    Illustration 7g01213266
    (B) Boom. (S) Stick.

  3. Install a shim (8) on each side of the boom between the boom and the stick at the pin bore. Shim (8) is identified by the tab on the shim. Install Tooling (C) into pin assembly (5). Attach a suitable lifting device to pin assembly (5). The weight of pin assembly (5) is approximately 47 kg (105 lb).

  4. Force the stick to one side of the boom. Measure the total clearance between the stick and the boom. Install the required shims.

  5. Use Tooling (C) and a suitable hammer in order to install pin assembly (5).

  6. Measure the total clearance between the stick and the boom at the pin bore. The total clearance is Dimension (X) plus Dimension (Y). The total clearance must not be more than 1.6 mm (0.063 inch). If the total clearance is less than 1.6 mm (0.063 inch), the addition of shims will not be necessary. If the total clearance is more than 1.6 mm (0.063 inch), the addition of shims will be required.

  7. If shims are required, remove pin assembly (5). Install the required amount of shims (9) and (10) between the stick and the boom on the side opposite retaining bolt (6). Locate shims (9) and (10) between the boom and shim (8). Install pin assembly (5).

  8. Install the washer and retaining bolt (6).

  9. Release the hydraulic system pressure. Refer to Disassembly and Assembly, "Hydraulic System Pressure - Release" in this manual.

  10. Install new O-ring seals in the ends of all hose assemblies (4). Connect all hose assemblies (4) in the hose's original location.


    Illustration 8g00687890

  11. Fasten a suitable lifting device to the rod end of stick cylinder (1). Extend stick cylinder (1) until the pin bore lines up with the pin bores in the stick. Install a shim on each side of the stick cylinder at the pin bore.

  12. Install the spacer and pin assembly (3). Install the washer and retaining bolt (2).

End By:

  1. Install bucket.

Information System:

320D2 GC Excavator Machine Systems Stick Cylinder - Remove and Install
320D2 GC Excavator Machine Systems Load Control Valve (Stick Cylinder) - Assemble
312F and 313F Excavator Machine Systems Electronic Control (Bucket System)
320D2 GC Excavator Machine Systems Load Control Valve (Stick Cylinder) - Disassemble
320D2 GC Excavator Machine Systems Load Control Valve (Stick Cylinder) - Remove and Install
312F and 313F Excavator Machine Systems Electronic Control (Stick System)
320D2 GC Excavator Machine Systems Bucket Cylinder - Remove and Install
312F and 313F Excavator Machine Systems Shovel Crane - Test and Adjust
312F and 313F Excavator Machine Systems Electronic Control (Boom System)
318F Excavator Machine Systems Stick - 3.1 m (10.17 ft)
Procedure to Rework Main Frames of Certain 422F, 428F, 432F, 434F, and 444F Backhoe Loaders {7054}
312F and 313F Excavator Machine System Specifications Pilot Lines
312F and 313F Excavator Machine Systems Electronic Control (Blade System)
Installation of the 418-7814 Auxiliary Hydraulic Lines Gp (Boom) on Certain Hydraulic Excavators {5057}
Procedure to Install a Bluetooth Module 481-7118 Wiring Kit on F2 Series Backhoe Loaders {1408}
320D2 GC Excavator Machine Systems Stick Bearings and Seals - Remove and Install
320D2 GC Excavator Machine Systems Load Control Valve (Boom Cylinder) - Remove and Install
320D2 GC Excavator Machine Systems Load Control Valve (Boom Cylinder) - Disassemble
320D2 GC Excavator Machine Systems Load Control Valve (Boom Cylinder) - Assemble
320D2 GC Excavator Machine Systems Boom Cylinder - Remove and Install
312F and 313F Excavator Machine Systems Electronic Control (Swing System)
Inspection Procedure for Boom Cylinder Assembly Cracks on Certain 330B, 330C, 345B, 345C, and 345D Excavators {5456, 7562}
312F and 313F Excavator Machine Systems Relief Valve (Swing)
312F and 313F Excavator Machine Systems Oil Makeup (Swing System)