415F2 Industrial Loader Power Train Final Drive Planetary - Remove and Install Caterpillar


Final Drive Planetary - Remove and Install
`
1.1. Removal Procedure
2.1. Installation Procedure

Removal Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
1P-1863  Retaining Ring Pliers 

Start By:

  1. Remove the wheel and tire.

  1. Refer to Operation and Maintenance Manual, "Final Drive Oil (Rear) - Change" for the correct draining and filling procedures.


    Illustration 1g01072848

  2. Remove screws (2) and planetary carrier assembly (3) from wheel flange (1).


    Illustration 2g03746854

  3. Use Tooling (A) to remove retaining ring (4). Remove thrust washer (5). Remove bearing (6) and planetary gear (7). Remove retaining ring (9) and thrust washer (8).

  4. Repeat Step 3 for the remaining planetary gear assemblies.

Installation Procedure

  1. Install planetary carrier assembly (3) in the reverse order of removal.

Information System:

415F2 Industrial Loader Power Train Tie Rod (Steering)(Front) - Remove and Install
349D2 MHPU Mobile Hydraulic Power Unit Machine System Track
415F2 Industrial Loader Power Train Drive Shaft (Rear) - Remove and Install
415F2 Industrial Loader Power Train Drive Shaft (Front) - Remove and Install
GSV520 and GSV525 Orange Peel Grapples Hydraulic Rotator - Remove and Install
Technical Analysis 1 (TA1) Visual Inspection for Hydraulic Hammers {0372, 1000, 7000, 753S, 7565}
Technical Analysis 1 (TA1) Visual Inspection for Generator Sets {0372, 1000, 7000, 753S, 7565}
349D2 MHPU Mobile Hydraulic Power Unit Machine System Swing Gear and Bearing
415F2 Industrial Loader Power Train Transmission (Direct Drive) - Install
330F MHPU Mobile Hydraulic Power Unit Engine Oil and Filter - Change
415F2 Industrial Loader Power Train Transmission (Direct Drive) - Assemble
325F Excavator Machine Systems Fuel Tank - Remove and Install
330F MHPU Mobile Hydraulic Power Unit Maintenance Interval Schedule
Similar Product Support Literature Available For Military Machines {0374, 1000, 7000}
415F2 Industrial Loader Power Train Axle Housing and Flange - Remove
415F2 Industrial Loader Power Train Final Drive Planetary - Remove and Install - Front
304.5E XTC Mini Hydraulic Excavators Machine Systems Pilot Valve (Joystick) - Remove and Install
Installation Procedure to Retrofit a Boom Lowering Control Valve on Certain 325D Forestry Machines {5057, 5147, 5811}
415F2 Industrial Loader Power Train Axle Housing and Flange - Disassemble
415F2 Industrial Loader Power Train Axle Housing and Flange - Assemble
415F2 Industrial Loader Power Train Axle Housing and Flange - Install
415F2 Industrial Loader Power Train Axle Shaft - Remove and Install
Installation Procedure to Retrofit a Boom Lowering Control Valve on Certain 568 LL Forestry Machines {1329, 1439, 1916, 1917, 1923, 1924, 5001, 5117, 5130, 5264, 5453}
A New Fuel Injection Pump Group is Used on Certain C9.3 Machine Engines {1251}