415F2 Industrial Loader Power Train Axle Housing and Flange - Remove Caterpillar


Axle Housing and Flange - Remove
`
1.1. Removal Procedure

Removal Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
1P-2320  Combination Puller 
230-7923  Spanner Wrench As 
2P-8312  Retaining Ring Pliers 

Start By:

  1. Remove the drive and steering axle.

  2. Remove the final drive planetary.


    Illustration 1g01047618

  1. Loosen nut (2). Do not remove nut (2) at this time. Install Tooling (A). Remove tie rod end (1) and nut (2). Position tie rod end (1) out of the way.


    Illustration 2g01047569

  2. Remove bolts (5) and remove locking plate (4). Use Tooling (B) to remove spanner nut (3).


    Illustration 3g01023074


    Illustration 4g01023075

  3. Use a suitable pry bar and push the double U-joint toward the wheel flange. This will enable the removal of retaining ring (8). Use Tooling (C) and remove retaining ring (8). Remove thrust washer (7) and washer (6).


    Illustration 5g01023088

  4. Remove ring gear (9).


    Illustration 6g01023126

  5. Remove wheel flange (10).

    Note: Bearing cone (11) will fall out of wheel flange (10) when wheel flange (10) is removed.



    Illustration 7g01023130

    Note: Note the order and orientation of shims (14) for assembly purposes.

  6. Remove bolts (12). Remove pin assembly (13) and shims (14). Remove bolts (16) and pin assembly (15).


    Illustration 8g01023136

  7. Use a suitable lifting device to remove knuckle (17). The weight of knuckle (17) is approximately 56 kg (123 lb).

Information System:

Similar Product Support Literature Available For Military Machines {0374, 1000, 7000}
330F MHPU Mobile Hydraulic Power Unit Maintenance Interval Schedule
415F2 Industrial Loader Power Train Final Drive Planetary - Remove and Install
415F2 Industrial Loader Power Train Tie Rod (Steering)(Front) - Remove and Install
349D2 MHPU Mobile Hydraulic Power Unit Machine System Track
415F2 Industrial Loader Power Train Drive Shaft (Rear) - Remove and Install
415F2 Industrial Loader Power Train Drive Shaft (Front) - Remove and Install
GSV520 and GSV525 Orange Peel Grapples Hydraulic Rotator - Remove and Install
Technical Analysis 1 (TA1) Visual Inspection for Hydraulic Hammers {0372, 1000, 7000, 753S, 7565}
Technical Analysis 1 (TA1) Visual Inspection for Generator Sets {0372, 1000, 7000, 753S, 7565}
349D2 MHPU Mobile Hydraulic Power Unit Machine System Swing Gear and Bearing
415F2 Industrial Loader Power Train Transmission (Direct Drive) - Install
415F2 Industrial Loader Power Train Final Drive Planetary - Remove and Install - Front
304.5E XTC Mini Hydraulic Excavators Machine Systems Pilot Valve (Joystick) - Remove and Install
Installation Procedure to Retrofit a Boom Lowering Control Valve on Certain 325D Forestry Machines {5057, 5147, 5811}
415F2 Industrial Loader Power Train Axle Housing and Flange - Disassemble
415F2 Industrial Loader Power Train Axle Housing and Flange - Assemble
415F2 Industrial Loader Power Train Axle Housing and Flange - Install
415F2 Industrial Loader Power Train Axle Shaft - Remove and Install
Installation Procedure to Retrofit a Boom Lowering Control Valve on Certain 568 LL Forestry Machines {1329, 1439, 1916, 1917, 1923, 1924, 5001, 5117, 5130, 5264, 5453}
A New Fuel Injection Pump Group is Used on Certain C9.3 Machine Engines {1251}
GSH420, GSH425, GSH440, GSH520, GSH525, GSH455 and GSH555 Orange Peel Grapples Swivel - Disassemble
GSH420, GSH425, GSH440, GSH520, GSH525, GSH455 and GSH555 Orange Peel Grapples Swivel - Assemble
345D, 349D and 349D2 Excavator Machine System Specifications Control Valve