415F2 Industrial Loader Power Train Axle Housing and Flange - Assemble Caterpillar


Axle Housing and Flange - Assemble
`
1.1. Assembly Procedure

Assembly Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
1P-0510  Driver Gp 
1P-0520  Driver Gp 
452-6001  Bearing Grease 


    Illustration 1g01038749

  1. Install bearing cone (14) onto knuckle (13).


    Illustration 2g01026726

  2. Use Tooling (A) and a suitable hammer and install the bushing into knuckle (13).


    Illustration 3g01029981

  3. Use Tooling (A) and install seal (12) into knuckle (13).


    Illustration 4g01023875

  4. Install seal (10) onto pin assembly (11). Raise the temperature of bearing cone (9). Install bearing cone (9) onto pin assembly (11). Repeat for the other pin assembly.

    Note: Use Tooling (C) after installing bearing cone (9) to pack bearing.



    Illustration 5g01023874

  5. Use Tooling (B) and a suitable hammer and install bearing cup (8) into wheel flange (7). Install spacer (6). Use Tooling (B) and a suitable hammer and install bearing cup (5) into wheel flange (7). Install seal (4).


    Illustration 6g01023873

  6. Install ring gear hub (2) into ring gear (3). Install retaining ring (1).

End By:

  1. Install the axle housing and the wheel flange.

Information System:

415F2 Industrial Loader Power Train Axle Housing and Flange - Disassemble
Installation Procedure to Retrofit a Boom Lowering Control Valve on Certain 325D Forestry Machines {5057, 5147, 5811}
304.5E XTC Mini Hydraulic Excavators Machine Systems Pilot Valve (Joystick) - Remove and Install
415F2 Industrial Loader Power Train Final Drive Planetary - Remove and Install - Front
415F2 Industrial Loader Power Train Axle Housing and Flange - Remove
Similar Product Support Literature Available For Military Machines {0374, 1000, 7000}
330F MHPU Mobile Hydraulic Power Unit Maintenance Interval Schedule
415F2 Industrial Loader Power Train Final Drive Planetary - Remove and Install
415F2 Industrial Loader Power Train Tie Rod (Steering)(Front) - Remove and Install
349D2 MHPU Mobile Hydraulic Power Unit Machine System Track
415F2 Industrial Loader Power Train Drive Shaft (Rear) - Remove and Install
415F2 Industrial Loader Power Train Drive Shaft (Front) - Remove and Install
415F2 Industrial Loader Power Train Axle Housing and Flange - Install
415F2 Industrial Loader Power Train Axle Shaft - Remove and Install
Installation Procedure to Retrofit a Boom Lowering Control Valve on Certain 568 LL Forestry Machines {1329, 1439, 1916, 1917, 1923, 1924, 5001, 5117, 5130, 5264, 5453}
A New Fuel Injection Pump Group is Used on Certain C9.3 Machine Engines {1251}
GSH420, GSH425, GSH440, GSH520, GSH525, GSH455 and GSH555 Orange Peel Grapples Swivel - Disassemble
GSH420, GSH425, GSH440, GSH520, GSH525, GSH455 and GSH555 Orange Peel Grapples Swivel - Assemble
345D, 349D and 349D2 Excavator Machine System Specifications Control Valve
GSV520 and GSV525 Orange Peel Grapples Shell Assembly - Remove and Install
325F Excavator Machine Systems Heating and Air Conditioning Unit - Remove and Install
Installation of the <NOBR>492-1508</NOBR> Auxiliary Control Ar on Certain Hydraulic Excavators {1408, 5258, 7405, 7557}
Installation of the <NOBR>327-7487</NOBR> Foot Pedal Gp on Certain Hydraulic Excavators {5258}
Installation of the <NOBR>360-6218</NOBR> Electronic Control Wiring Gp on Certain Hydraulic Excavators {1408}