Shell Assembly - Remove and Install
`
GSV520 and GSV525 Orange Peel Grapples
[UENR5297]
GSV520 and GSV525 Orange Peel Grapples
Hydraulic Rotator - Remove and Install
GSV520 and GSV525 Orange Peel Grapples
Hydraulic Cylinder - Remove and Install
HYDRAULIC SYSTEM
CYLINDER GP
GSV520 and GSV525 Orange Peel Grapples
Hydraulic Cylinder
GSV520 and GSV525 Orange Peel Grapples
Hydraulic Cylinder Cycle Time - Check
GSV520 and GSV525 Orange Peel Grapples
Hydraulic Cylinder Leakage - Test
GSV520 and GSV525 Orange Peel Grapples
Shell Assembly - Remove and Install
GSV520 and GSV525 Orange Peel Grapples
Hydraulic Cylinder - Remove and Install
GSV520 and GSV525 Orange Peel Grapples
Hydraulic Cylinder - Disassemble
GSV520 and GSV525 Orange Peel Grapples
Hydraulic Cylinder - Assemble
1.1. Removal Procedure
2.1. Installation Procedure
Start By:
- Remove the hydraulic cylinder.
- Attach a suitable lifting device to the head assembly. The weight of the grapple is approximately
2217 kg (4888 lb) .Show/hide tableIllustration 2 g06023389 Show/hide tableIllustration 3 g06023395 Note: To prevent instability during the shell removal and installation, support the grapple assembly with a suitable lift stand as shown in Illustration 3.
- Attach a suitable lifting device to shell assembly (1). The weight of shell assembly (1) is approximately
224 kg (494 lb) . - Remove nut (2), washer (3), and pin (4). Remove shell assembly (1).
Show/hide table
Illustration 1 | g06032624 |
Show/hide table
Required Tools | |||
Tool | Part Number | Part Description | Qty |
A | 452-6006 | Grease | - |
- Install shell assembly (1) in the reverse order of removal.
- Coat the bores for pin (4) with Tooling (A).
Note: Assemble pin (4) with lubricant bore pointing towards the housing.
- Coat the bores for pin (4) with Tooling (A).
End by:
a. Install the hydraulic cylinder.
Information System:
345D, 349D and 349D2 Excavator Machine System Specifications
Control Valve
GSH420, GSH425, GSH440, GSH520, GSH525, GSH455 and GSH555 Orange Peel Grapples
Swivel - Assemble
GSH420, GSH425, GSH440, GSH520, GSH525, GSH455 and GSH555 Orange Peel Grapples
Swivel - Disassemble
A New Fuel Injection Pump Group is Used on Certain C9.3 Machine Engines {1251}
Installation Procedure to Retrofit a Boom Lowering Control Valve on Certain 568 LL Forestry Machines {1329, 1439, 1916, 1917, 1923, 1924, 5001, 5117, 5130, 5264, 5453}
415F2 Industrial Loader Power Train
Axle Shaft - Remove and Install
415F2 Industrial Loader Power Train
Axle Housing and Flange - Install
415F2 Industrial Loader Power Train
Axle Housing and Flange - Assemble
415F2 Industrial Loader Power Train
Axle Housing and Flange - Disassemble
Installation Procedure to Retrofit a Boom Lowering Control Valve on Certain 325D Forestry Machines {5057, 5147, 5811}
304.5E XTC Mini Hydraulic Excavators Machine Systems
Pilot Valve (Joystick) - Remove and Install
415F2 Industrial Loader Power Train
Final Drive Planetary - Remove and Install - Front
325F Excavator Machine Systems
Heating and Air Conditioning Unit - Remove and Install
Installation of the <NOBR>492-1508</NOBR> Auxiliary Control Ar on Certain Hydraulic Excavators {1408, 5258, 7405, 7557}
Installation of the <NOBR>327-7487</NOBR> Foot Pedal Gp on Certain Hydraulic Excavators {5258}
Installation of the <NOBR>360-6218</NOBR> Electronic Control Wiring Gp on Certain Hydraulic Excavators {1408}
415F2 Industrial Loader Power Train
Axle Housing (Differential and Bevel Gear) (Front) - Disassemble
415F2 Industrial Loader Power Train
Axle Housing (Differential and Bevel Gear) (Front) - Assemble
415F2 Industrial Loader Power Train
Drive and Steering Axle (Front) - Remove
415F2 Industrial Loader Power Train
Drive and Steering Axle (Front) - Install
325F Excavator Machine Systems
Track Roller - Remove and Install
325F Excavator Machine Systems
Track - Separate
GSV520 and GSV525 Orange Peel Grapples
Hydraulic Cylinder - Remove and Install
340F Excavator
Guards - Operator Protection