415F2 Industrial Loader Power Train Drive and Steering Axle (Front) - Install Caterpillar


Drive and Steering Axle (Front) - Install
`
1.1. Installation Procedure

Installation Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
422-8733  Support Stand 
444-0526  Air/Hydraulic Jack Gp 
1P-0520  Driver Gp 


    Illustration 1g03766218

  1. Use Tooling (C) to install bushing (12) and seal (11). Repeat this step for the other side.

    Note: Do not apply any lubricant to the inside diameter of seal (11) or bushing (12).



    Illustration 2g03765837


    Illustration 3g03765882

  2. Attach a suitable lifting device to both sides of front drive and steering axle (6). The weight of front drive and steering axle (6) is approximately 408 kg (900 lb). Use the suitable lifting device to position front drive and steering axle (6) to the machine.

  3. Install pin assembly (5) along with washers (8) and (9). Install thrust washers (7) and (10).

    Note: Do not apply any lubricant to pin assembly (5)



    Illustration 4g03764917

  4. Install bolt (4) to secure pin assembly (5).

    Note: Use the required number of washers (9) on the front side of the drive and steering axle (6) to maintain a gap of 0.8 mm (0.03 inch) maximum.



    Illustration 5g03764901

  5. Connect drive shaft (3).


    Illustration 6g03764858

  6. Connect both hose assemblies (2).

  7. Install the batteries.

  8. Install the front tires and rims.

  9. Install the front fenders.


    Illustration 7g03764378

  10. Use Tooling (B) to remove Tooling (A) from the front of the machine.


    Illustration 8g06043550

    Note: Typical example.

  11. Remove lift cylinder brace (1) and lower the lift arms.

End By:

  1. Install the bucket.

Information System:

415F2 Industrial Loader Power Train Drive and Steering Axle (Front) - Remove
415F2 Industrial Loader Power Train Axle Housing (Differential and Bevel Gear) (Front) - Assemble
415F2 Industrial Loader Power Train Axle Housing (Differential and Bevel Gear) (Front) - Disassemble
Installation of the <NOBR>360-6218</NOBR> Electronic Control Wiring Gp on Certain Hydraulic Excavators {1408}
Installation of the <NOBR>327-7487</NOBR> Foot Pedal Gp on Certain Hydraulic Excavators {5258}
Installation of the <NOBR>492-1508</NOBR> Auxiliary Control Ar on Certain Hydraulic Excavators {1408, 5258, 7405, 7557}
325F Excavator Machine Systems Heating and Air Conditioning Unit - Remove and Install
GSV520 and GSV525 Orange Peel Grapples Shell Assembly - Remove and Install
345D, 349D and 349D2 Excavator Machine System Specifications Control Valve
GSH420, GSH425, GSH440, GSH520, GSH525, GSH455 and GSH555 Orange Peel Grapples Swivel - Assemble
GSH420, GSH425, GSH440, GSH520, GSH525, GSH455 and GSH555 Orange Peel Grapples Swivel - Disassemble
A New Fuel Injection Pump Group is Used on Certain C9.3 Machine Engines {1251}
325F Excavator Machine Systems Track Roller - Remove and Install
325F Excavator Machine Systems Track - Separate
GSV520 and GSV525 Orange Peel Grapples Hydraulic Cylinder - Remove and Install
340F Excavator Guards - Operator Protection
340F Excavator Shipping the Machine
PM620, PM622, PM820, PM822 and PM825 Cold Planers Electronic System Sensor Signal (Analog, Active) - Test
415F2 Industrial Loader Power Train Steering Cylinder (Front) - Remove and Install
538, 548 and 558 Forest Machine Diagnostic Trouble Codes
538, 548 and 558 Forest Machine Event Codes
415F2 Industrial Loader Power Train Rear Axle - Remove
415F2 Industrial Loader Power Train Rear Axle - Install
415IL Backhoe Loader Power Train Axle Housing, Axle Shaft, and Wheel Flange - Remove - Rear Axle