Track Roller - Remove and Install
`
325F Excavator Machine Systems
[UENR6794]
325F Excavator Machine Systems
Heating and Air Conditioning Unit - Remove and Install
325F Excavator Machine Systems
Track - Separate
UNDERCARRIAGE
ROLLER GP
325F Excavator Machine Systems
Track Roller - Remove and Install
325F Excavator Machine Systems
Track Carrier Roller - Remove and Install
1.1. Removal Procedure
2.1. Installation Procedure
Show/hide table
Required Tools | |||
---|---|---|---|
Tool | Part Number | Part Description | Qty |
A | 8S-7611 | Tube | 2 |
8S-7615 | Pin | 2 | |
8S-7640 | Stand | 2 | |
B | 183-4797 | Track Roller Lifting Fork | 1 |
Note: There is a track guide on each side of the machine. The procedure that follows is for the removal of the track roller with the track guide.
- Start the engine. Park the machine on a hard, level surface. Stop the engine.
- Release the tension on the track. Refer to Operation and Maintenance Manual, "Track Adjustment - Adjust".
Show/hide table
Illustration 1 g01211423 Note: Adjust the height of Tooling (A) in order to have sufficient clearance for the removal of the track rollers when Tooling (A) is installed under the undercarriage (1) of the machine.
- Lift the side of the machine. Install Tooling (A) under the undercarriage, as shown.
Show/hide table
Illustration 2 g00664654 - Loosen the bolts that hold track guide (2) to the undercarriage.
Note: Do not remove the bolts at this time.
Show/hide tableIllustration 3 g00664663 - Position Tooling (B) and a suitable lifting device under track guide (2), as shown. Remove the bolts that secure the track guide. Remove track guide (2).
Show/hide table
Illustration 4 g01212141 - Remove rock guards (3) from the undercarriage, if equipped.
Show/hide table
Illustration 5 g01212158 - Loosen the bolts that secure track roller (4) to the undercarriage.
Note: Do not remove the bolts at this time.
- Position Tooling (B) and a suitable lifting device under track roller (4), as shown.
- Remove the bolts that secure track roller (4). The weight of track roller (4) is approximately
40 kg (88 lb) . Remove track roller (4). - Refer to Undercarriage Reconditioning Bulletin, "Hydraulic Excavator Roller Disassemble and Assembly Procedures" for the disassembly and assembly procedures of the track roller.
- Install the track roller (4) in the reverse order of removal.
Information System:
415F2 Industrial Loader Power Train
Drive and Steering Axle (Front) - Install
415F2 Industrial Loader Power Train
Drive and Steering Axle (Front) - Remove
415F2 Industrial Loader Power Train
Axle Housing (Differential and Bevel Gear) (Front) - Assemble
415F2 Industrial Loader Power Train
Axle Housing (Differential and Bevel Gear) (Front) - Disassemble
Installation of the <NOBR>360-6218</NOBR> Electronic Control Wiring Gp on Certain Hydraulic Excavators {1408}
Installation of the <NOBR>327-7487</NOBR> Foot Pedal Gp on Certain Hydraulic Excavators {5258}
Installation of the <NOBR>492-1508</NOBR> Auxiliary Control Ar on Certain Hydraulic Excavators {1408, 5258, 7405, 7557}
325F Excavator Machine Systems
Heating and Air Conditioning Unit - Remove and Install
GSV520 and GSV525 Orange Peel Grapples
Shell Assembly - Remove and Install
345D, 349D and 349D2 Excavator Machine System Specifications
Control Valve
GSH420, GSH425, GSH440, GSH520, GSH525, GSH455 and GSH555 Orange Peel Grapples
Swivel - Assemble
GSH420, GSH425, GSH440, GSH520, GSH525, GSH455 and GSH555 Orange Peel Grapples
Swivel - Disassemble
325F Excavator Machine Systems
Track - Separate
GSV520 and GSV525 Orange Peel Grapples
Hydraulic Cylinder - Remove and Install
340F Excavator
Guards - Operator Protection
340F Excavator
Shipping the Machine
PM620, PM622, PM820, PM822 and PM825 Cold Planers Electronic System
Sensor Signal (Analog, Active) - Test
415F2 Industrial Loader Power Train
Steering Cylinder (Front) - Remove and Install
538, 548 and 558 Forest Machine
Diagnostic Trouble Codes
538, 548 and 558 Forest Machine
Event Codes
415F2 Industrial Loader Power Train
Rear Axle - Remove
415F2 Industrial Loader Power Train
Rear Axle - Install
415IL Backhoe Loader Power Train
Axle Housing, Axle Shaft, and Wheel Flange - Remove - Rear Axle
415IL Backhoe Loader Power Train
Axle Housing, Axle Shaft, and Wheel Flange - Disassemble - Rear Axle