325F Excavator Machine Systems Track Roller - Remove and Install Caterpillar


Track Roller - Remove and Install
`
1.1. Removal Procedure
2.1. Installation Procedure

Removal Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
8S-7611  Tube 
8S-7615 Pin 
8S-7640 Stand 
183-4797  Track Roller Lifting Fork 

Note: There is a track guide on each side of the machine. The procedure that follows is for the removal of the track roller with the track guide.

  1. Start the engine. Park the machine on a hard, level surface. Stop the engine.

  2. Release the tension on the track. Refer to Operation and Maintenance Manual, "Track Adjustment - Adjust".


    Illustration 1g01211423

    Note: Adjust the height of Tooling (A) in order to have sufficient clearance for the removal of the track rollers when Tooling (A) is installed under the undercarriage (1) of the machine.

  3. Lift the side of the machine. Install Tooling (A) under the undercarriage, as shown.


    Illustration 2g00664654

  4. Loosen the bolts that hold track guide (2) to the undercarriage.

    Note: Do not remove the bolts at this time.



    Illustration 3g00664663

  5. Position Tooling (B) and a suitable lifting device under track guide (2), as shown. Remove the bolts that secure the track guide. Remove track guide (2).


    Illustration 4g01212141

  6. Remove rock guards (3) from the undercarriage, if equipped.


    Illustration 5g01212158

  7. Loosen the bolts that secure track roller (4) to the undercarriage.

    Note: Do not remove the bolts at this time.

  8. Position Tooling (B) and a suitable lifting device under track roller (4), as shown.

  9. Remove the bolts that secure track roller (4). The weight of track roller (4) is approximately 40 kg (88 lb). Remove track roller (4).

  10. Refer to Undercarriage Reconditioning Bulletin, "Hydraulic Excavator Roller Disassemble and Assembly Procedures" for the disassembly and assembly procedures of the track roller.

Installation Procedure

  1. Install the track roller (4) in the reverse order of removal.

Information System:

415F2 Industrial Loader Power Train Drive and Steering Axle (Front) - Install
415F2 Industrial Loader Power Train Drive and Steering Axle (Front) - Remove
415F2 Industrial Loader Power Train Axle Housing (Differential and Bevel Gear) (Front) - Assemble
415F2 Industrial Loader Power Train Axle Housing (Differential and Bevel Gear) (Front) - Disassemble
Installation of the <NOBR>360-6218</NOBR> Electronic Control Wiring Gp on Certain Hydraulic Excavators {1408}
Installation of the <NOBR>327-7487</NOBR> Foot Pedal Gp on Certain Hydraulic Excavators {5258}
Installation of the <NOBR>492-1508</NOBR> Auxiliary Control Ar on Certain Hydraulic Excavators {1408, 5258, 7405, 7557}
325F Excavator Machine Systems Heating and Air Conditioning Unit - Remove and Install
GSV520 and GSV525 Orange Peel Grapples Shell Assembly - Remove and Install
345D, 349D and 349D2 Excavator Machine System Specifications Control Valve
GSH420, GSH425, GSH440, GSH520, GSH525, GSH455 and GSH555 Orange Peel Grapples Swivel - Assemble
GSH420, GSH425, GSH440, GSH520, GSH525, GSH455 and GSH555 Orange Peel Grapples Swivel - Disassemble
325F Excavator Machine Systems Track - Separate
GSV520 and GSV525 Orange Peel Grapples Hydraulic Cylinder - Remove and Install
340F Excavator Guards - Operator Protection
340F Excavator Shipping the Machine
PM620, PM622, PM820, PM822 and PM825 Cold Planers Electronic System Sensor Signal (Analog, Active) - Test
415F2 Industrial Loader Power Train Steering Cylinder (Front) - Remove and Install
538, 548 and 558 Forest Machine Diagnostic Trouble Codes
538, 548 and 558 Forest Machine Event Codes
415F2 Industrial Loader Power Train Rear Axle - Remove
415F2 Industrial Loader Power Train Rear Axle - Install
415IL Backhoe Loader Power Train Axle Housing, Axle Shaft, and Wheel Flange - Remove - Rear Axle
415IL Backhoe Loader Power Train Axle Housing, Axle Shaft, and Wheel Flange - Disassemble - Rear Axle