325F Excavator Machine Systems Track - Separate Caterpillar


Track - Separate
`
1.1. Separation Procedure
2.1. Connection Procedure

Separation Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
260-9412  Chain As 
5P-6214  Track Block Assembly 
5P-2379  Track Press Tool Gp 
8S-7172 Double Acting Cylinder 
8S-9903 Track Press Rollover Gp 


    Illustration 1g02709182

  1. Position the track so that the master pin is above the center line of the sprocket or idler.

  2. Stop the machine and release the track tension.


    Illustration 2g02709234

  3. Use Tooling (A) to support track shoe (2). Remove bolts (1) and track shoe (2).

    Note: In order to provide additional clearance for the removal of the master pin, remove track shoe (2) on each side of master pin.



    Illustration 3g02709217

  4. In order to prevent the track from sliding off the roller frame, place Tooling (B) on opposite ends of the track.


    Illustration 4g02710687

  5. Use Tooling (C) and a suitable lifting device in order to remove pin (3). Carefully lower the track assembly to the ground.

Connection Procedure

Table 2
Required Tools 
Tool  Part Number  Part Description  Qty 
260-9412  Chain As 
5P-6214  Track Block Assembly 
5P-2379  Track Press Tool Gp 
8S-7172 Double Acting Cylinder 
8S-9903 Track Press Rollover Gp   
  1U-9200  Lever Puller Hoist Gp 


    Illustration 5g02710740

  1. Use Tooling (D) in order to lift track assembly into place.


    Illustration 6g02710747

  2. Use Tooling (C) and a suitable lifting device to install pin (3).


    Illustration 7g02706300

  3. Install track shoe (2) and bolts (1). Tighten bolts (1) to a torque of 400 ± 70 N·m (295 ± 52 lb ft). Tighten bolts (1) by an additional 120 degrees.


    Illustration 8g02706319

  4. Remove Tooling (B) from both ends of the track assembly.

  5. Adjust the track tension.

Information System:

325F Excavator Machine Systems Track Roller - Remove and Install
415F2 Industrial Loader Power Train Drive and Steering Axle (Front) - Install
415F2 Industrial Loader Power Train Drive and Steering Axle (Front) - Remove
415F2 Industrial Loader Power Train Axle Housing (Differential and Bevel Gear) (Front) - Assemble
415F2 Industrial Loader Power Train Axle Housing (Differential and Bevel Gear) (Front) - Disassemble
Installation of the <NOBR>360-6218</NOBR> Electronic Control Wiring Gp on Certain Hydraulic Excavators {1408}
Installation of the <NOBR>327-7487</NOBR> Foot Pedal Gp on Certain Hydraulic Excavators {5258}
Installation of the <NOBR>492-1508</NOBR> Auxiliary Control Ar on Certain Hydraulic Excavators {1408, 5258, 7405, 7557}
325F Excavator Machine Systems Heating and Air Conditioning Unit - Remove and Install
GSV520 and GSV525 Orange Peel Grapples Shell Assembly - Remove and Install
345D, 349D and 349D2 Excavator Machine System Specifications Control Valve
GSH420, GSH425, GSH440, GSH520, GSH525, GSH455 and GSH555 Orange Peel Grapples Swivel - Assemble
GSV520 and GSV525 Orange Peel Grapples Hydraulic Cylinder - Remove and Install
340F Excavator Guards - Operator Protection
340F Excavator Shipping the Machine
PM620, PM622, PM820, PM822 and PM825 Cold Planers Electronic System Sensor Signal (Analog, Active) - Test
415F2 Industrial Loader Power Train Steering Cylinder (Front) - Remove and Install
538, 548 and 558 Forest Machine Diagnostic Trouble Codes
538, 548 and 558 Forest Machine Event Codes
415F2 Industrial Loader Power Train Rear Axle - Remove
415F2 Industrial Loader Power Train Rear Axle - Install
415IL Backhoe Loader Power Train Axle Housing, Axle Shaft, and Wheel Flange - Remove - Rear Axle
415IL Backhoe Loader Power Train Axle Housing, Axle Shaft, and Wheel Flange - Disassemble - Rear Axle
352F Mobile Hydraulic Power Unit (MHPU) Machine Systems Specifications