Boom - Remove and Install
`
336D 2L and 340D 2L Excavators Machine Systems
[M0065626]
336D 2L and 340D 2L Excavators Machine Systems
Stick Bearings and Seals - Remove and Install
336D 2L and 340D 2L Excavators Machine Systems
Final Drive and Travel Motor - Remove and Install
IMPLEMENTS
BOOM GP
336D 2L and 340D 2L Excavators Machine Systems
Boom - Remove and Install
336D 2L and 340D 2L Excavators Machine Systems
Boom Bearings and Seals - Remove and Install
1.1. Removal Procedure
2.1. Installation Procedure
Show/hide table
Required Tools | |||
Tool | Part Number | Part Description | Qty |
A | 9U-6225 | Pin Driver Cap | 1 |
B | 1U-9202 | Lever Puller Hoist | 1 |
C | 350-7768 | Electric Hydraulic Pump Gp | 1 |
141-1785 | Receiving Sleeve | 1 | |
9U-6811 | Puller Stud | 1 | |
9U-6809 | Nut | 1 | |
316-1489 | Double Acting Cylinder | 1 | |
D | 452-6006 | Grease Cartridge | 1 |
Start By:
a. Release the hydraulic system pressure.
b. Remove the stick.
- Disconnect grease hose assembly (1) from boom cylinder (3). Remove bolts (2), plate (4), and the spacer.
Show/hide table
Illustration 2 g01225067 - Attach a suitable lifting device to boom cylinder (3). The weight of boom cylinder (3) is approximately
380 kg (838 lb) . Install Tooling (A) into pin (5). Use a hammer to drive pin (5) out of boom cylinder (3). Lower boom cylinder (3).Note: Remove any shims that may be present. Mark the shims for installation purposes.
- Repeat Steps 1 through 2 for the other boom cylinder.
Show/hide table
Illustration 3 g01212891 - Remove bolts (6). Remove cover (7).
Show/hide table
Illustration 4 g01212899 - Remove bolts (8). Remove step (9).
Show/hide table
Illustration 5 g01212931 Show/hide tableIllustration 6 g01212925 - Open cover (10) of the storage box. Remove bolts (13). Remove bolts (12) and remove handhold (11).
Show/hide table
Illustration 7 g01227852 - Position plate (4) and bolts (2) onto each side of pin (5). Attach a suitable lifting device to each side of pin (5).
Show/hide table
Illustration 8 g01217554 - Attach a suitable lifting device to pin assembly (15). The weight of pin assembly (15) is approximately
61 kg (135 lb) . Install pin assembly (15) and install bolt (16).Show/hide tableIllustration 9 g01212951 - Attach Tooling (B) and a suitable lifting device to boom (14) and pin assembly (15). The combined weight of boom (14) and the stick cylinder is between
2835 kg (6250 lb) and2914 kg (6425 lb) . Apply slight lifting tension to boom (14).Show/hide tableIllustration 10 g01225070 - Disconnect hose assemblies (17).
Show/hide table
Illustration 11 g01225071 - Disconnect harness assembly (19). Disconnect hose assemblies (18), (20), (21), and (22).
Show/hide table
Illustration 12 g01225068 Show/hide tableIllustration 13 g01226791 - Remove bolt (24). Attach a suitable lifting device to Tooling (C). The weight of Tooling (C) is approximately
136 kg (300 lb) . Attach Tooling (C) to pin assembly (23). Use Tooling (C) to remove pin assembly (23). The combined weight of Tooling (C) and pin assembly (23) is approximately245 kg (540 lb) . - Remove the boom. Remove shims if present.
Note: Note down the locations of any shims for assembly purposes.
Show/hide table
![]() | |
Illustration 1 | g01225073 |
Note: Make sure that the pin bores in the boom and upper frame are clean and free of dirt and debris prior to installing the boom in the upper frame.
- Apply Tooling (D) to the bores in the upper frame and in the bore of the boom.
Show/hide table
Illustration 14 g01227852 Show/hide tableIllustration 15 g01217554 Show/hide tableIllustration 16 g01212951 - Position plate (4) and install bolts (2) onto each side of pin (5).
- Attach a suitable lifting device to pin assembly (15). The weight of pin assembly (15) is approximately
61 kg (135 lb) . Install pin assembly (15) and install bolt (16). - Attach Tooling (B) and a suitable lifting device to boom (14). The combined weight of boom (14) and the stick cylinder is between
2835 kg (6250 lb) and2914 kg (6425 lb) . Position boom (14) onto the machine.Show/hide tableIllustration 17 g01217774 - Apply Tooling (D) to pin assembly (23). Attach a suitable lifting device to pin assembly (23). The weight of pin assembly (23) is approximately
109 kg (240 lb) . Use Tooling (A) and the suitable lifting device to install pin assembly (23).Show/hide tableIllustration 18 g01213028 - Measure the total clearance between the boom and the upper frame at the bore for the boom foot pin assembly. The total clearance of Dimension (a) plus Dimension (b) must not be more than
1.0 mm (0.04 inch) . If the total clearance is less than1.0 mm (0.04 inch) , the addition of shims between the boom and the upper frame will not be required. If the total clearance is more than1.0 mm (0.04 inch) , add the correct thickness of shims to obtain the required clearance. - Use the following table to determine the correct shims (25).
Show/hide table
Table 2 Table for Shims (25) Shim Thickness (mm) 166-1487 2.0(1) 113-2127 0.5 093-0084 1.0 093-0116 2.0 Show/hide table(1) This shim is required to be used. This shim must be next to the boom. Show/hide tableIllustration 19 g01226791 - If shims (25) should be installed, attach a suitable lifting device to Tooling (C). The weight of Tooling (C) is approximately
136 kg (300 lb) . Attach Tooling (C) to pin assembly (23). Use Tooling (C) to remove pin assembly (23). The combined weight of Tooling (C) and pin assembly (23) is approximately245 kg (540 lb) . - Install the correct number of shims. Repeat Step 6.
Show/hide table
Illustration 20 g01225068 - Remove Tooling (C) and the suitable lifting device. Install bolt (24) that retains pin assembly (23).
Show/hide table
Illustration 21 g01225071 - Connect harness assembly (19). Connect hose assemblies (18), (20), (21), and (22). Tighten hose assemblies (18) and (20) to a torque of
76 ± 4 N·m (56 ± 3 lb ft) .Show/hide tableIllustration 22 g01225070 - Connect hose assemblies (17).
Show/hide table
Illustration 23 g01212931 Show/hide tableIllustration 24 g01212925 - Position handhold (11) and bolts (12). Install bolts (13). Close cover (10) of the storage box.
Show/hide table
Illustration 25 g01212899 - Install step (9). Install bolts (8).
Show/hide table
Illustration 26 g01212891 - Install cover (7) and bolts (6).
Show/hide table
Illustration 27 g01225067 - Use Tooling (A) to drive pin (5) so that the pin is flush with the boom. Remove Tooling (A) and install Tooling (A) onto the other side of pin (5).
- Attach a suitable lifting device to boom cylinder (3). The weight of boom cylinder (3) is approximately
380 kg (838 lb) . - Raise boom cylinder (3) into position. Install all shims that were present. Install Tooling (A) into pin (5). Use a hammer to drive pin (5) into boom cylinder (3). Remove Tooling (A). Repeat for the other boom cylinder (3).
Show/hide table
Illustration 28 g01225073 - Install the plate (4) and the spacer. Install bolts (2). Connect grease hose assembly (1).
End By:
a. Install the stick.
Information System:
GSH420, GSH425, GSH440, GSH520, GSH525, GSH455 and GSH555 Orange Peel Grapples
Bushings (Grapple) - Remove and Install
314F and 315F Excavators Machine System Specifications
Boom Lines
314F and 315F Excavators Machine System Specifications
Pilot Valve
325F Excavator Machine Systems
Sprocket - Remove and Install
330F MHPU Mobile Hydraulic Power Unit Machine System
Engine Performance - Test - Engine Speed
C2.4 Tier 4 Final Engines for Caterpillar Built Machines
Glow Plugs
C2.4 Tier 4 Final Engines for Caterpillar Built Machines
Gear Group (Front)
C2.4 Tier 4 Final Engines for Caterpillar Built Machines
Piston and Rings
C2.4 Tier 4 Final Engines for Caterpillar Built Machines
Crankshaft
C2.4 Tier 4 Final Engines for Caterpillar Built Machines
Camshaft
C2.4 Tier 4 Final Engines for Caterpillar Built Machines
Cylinder Head
Installation Procedure for the <NOBR>494-6811</NOBR> Cab Wiring Gp On Certain Hydraulic Excavators {1408, 7301}
314F and 315F Excavators Machine System Specifications
Boom Cylinder Lines
314F and 315F Excavators Machine System Specifications
Swing Drive
314F and 315F Excavators Machine System Specifications
Boom Cylinder Lines
314F and 315F Excavators Machine System Specifications
Fuel Tank
314F and 315F Excavators Machine System Specifications
Boom Cylinder Lines
336D 2L and 340D 2L Excavators Machine Systems
Final Drive and Travel Motor - Remove and Install
314F and 315F Excavators Machine System Specifications
Swing Drive Mounting
313D2 and 313D2 GC Excavator Machine Systems Specifications
Track Roller Mounting
330F MHPU Mobile Hydraulic Power Unit Machine System
Power Shift Pressure - Check
325F Excavator Machine Systems
Counterbalance Valve (Travel) - Remove and Install
330F MHPU Mobile Hydraulic Power Unit Machine System
Gear Pump (Pilot) - Test
325F Excavator Engine Supplement
Diesel Exhaust Fluid Tank - Remove and Install