Throttle Valve (Intake Air) - Install
`
1.1. Installation Procedure
Show/hide table
NOTICE |
---|
Ensure that wiring harness are correctly routed and the cable straps are not over tightened. Over tightening of the cable straps will damage the wiring harness convoluting. |
Show/hide table
NOTICE |
---|
Keep all parts clean from contaminants. Contaminants may cause rapid wear and shortened component life. |
- Ensure that throttle valve (7) assembly is clean and free from wear and damage. If necessary, replace the throttle valve assembly.
- If necessary, install stud (11). Tighten the stud to a torque of
11 N·m (97 lb in) . - Position a new gasket (14) onto inlet air control. Ensure that gasket serrations are correctly located onto locating Pins (A) on the inlet air control.
- Position a new gasket (13) throttle valve (7) assembly . Ensure that gasket serrations are correctly located onto locating Pins (B) on the throttle valve assembly.
- Install throttle valve (7) onto inlet air control.
- Install inlet connection (10) onto throttle valve (7) assembly.
- Install nut (12) and bolts (15). Tighten the nut and the bolts to a torque of
18 N·m (159 lb in) .Show/hide tableIllustration 3 g02361636 - Position new sealing washers (1) (not shown) onto banjo connection for tube assembly (3) and install banjo bolt (2) to tube assembly (3).
- Install bolt (4) to clip for tube assembly (3).
- Tighten bolts (4) to a torque of
18 N·m (159 lb in) . - Tighten banjo bolt (2) to a torque of
15 N·m (133 lb in) . - Connect harness assembly (5) to throttle valve assembly (7). Slide locking tab (6) into the locked position.
- Slide connection for the harness assembly (9) for wastegate solenoid onto the bracket. Connect harness assembly (9) for wastegate solenoid. Slide locking tab for harness assembly (9) into the locked position.
- Install new cable straps (8) to harness assembly (5).
Note: Ensure that cable straps meet the Original Equipment Manufacturers (OEM) specification.
- Connect hose assembly to inlet connection (10) and tighten the hose clamps to a torque of
6 N·m (53 lb in) . - Turn the battery disconnect switch to the ON position.
Show/hide table
![]() | |
Illustration 1 | g02162080 |
Show/hide table
![]() | |
Illustration 2 | g02162079 |
Information System:
C7.1 Industrial Engine
Temperature Sensor (Cooled Exhaust Gas) - Remove and Install
C7.1 Industrial Engine
Temperature Sensor (DPF) - Remove and Install - Temperature Sensor (DPF) and Flame Detection Sensor
C7.1 Industrial Engine
Soot Antenna - Remove and Install
C7.1 Industrial Engine
Rocker Shaft and Pushrod - Remove
C7.1 Industrial Engine
Rocker Shaft and Pushrod - Install
C7.1 Industrial Engine
Rocker Shaft - Disassemble
C7.1 Industrial Engine
Rocker Shaft - Assemble
C7.1 Industrial Engine
Relay (ARD Nozzle Heater) - Remove and Install - Clean Emissions Module
C7.1 Industrial Engine
Refrigerant Compressor - Remove and Install
C7.1 Industrial Engine
Rear Power Take-Off (RPTO) - Remove
C7.1 Industrial Engine
Rear Power Take-Off (RPTO) - Install
C7.1 Industrial Engine
Pressure Sensor (Cooled Exhaust Gas) - Remove and Install - Differential Pressure Sensor
C7.1 Industrial Engine
Throttle Valve (Intake Air) - Remove
C7.1 Industrial Engine
Turbocharger - Install - First Stage Turbocharger
C7.1 Industrial Engine
Turbocharger - Remove - First Stage Turbocharger
C7.1 Industrial Engine
Turbocharger - Install - Second Stage Turbocharger
C7.1 Industrial Engine
Turbocharger - Remove - Second Stage Turbocharger
C7.1 Industrial Engine
Valve Mechanism Cover - Remove and Install
C7.1 Industrial Engine
Vibration Damper and Pulley - Install
C7.1 Industrial Engine
Vibration Damper and Pulley - Remove
C7.1 Industrial Engine
Wastegate Solenoid - Remove and Install
C7.1 Industrial Engine
Water Pump - Install
C7.1 Industrial Engine
Water Pump - Remove
C7.1 Industrial Engine
Water Temperature Regulator - Remove and Install