Throttle Valve (Intake Air) - Remove
`
C7.1 Industrial Engine
[KENR9105]
C7.1 Industrial Engine
Throttle Valve (Intake Air) - Install
C7.1 Industrial Engine
Turbocharger - Install - First Stage Turbocharger
1.1. Removal Procedure
Show/hide table
NOTICE |
---|
Keep all parts clean from contaminants. Contaminants may cause rapid wear and shortened component life. |
- Turn the battery disconnect switch to the OFF position.
Show/hide table
Illustration 1 g02361636 - Disconnect hose assembly from inlet connection (10).
- Remove banjo bolt (2) and remove sealing washers (1) (not shown). Remove bolt (4) from clip for tube assembly (3).
- Slide locking tab (6) into the unlocked position. Disconnect harness assembly (5) for throttle valve (7).
- Slide the locking tab for harness assembly (9) for the wastegate solenoid into the unlocked position. Disconnect harness assembly (9) for the wastegate solenoid. Slide connection for harness assembly (9) for the wastegate solenoid from the bracket.
- Cut cable straps (8) and position harness assembly (5) and harness assembly (9) for the wastegate solenoid away from throttle valve (7).
Show/hide table
Illustration 2 g02161585 - Remove bolts (15) and nut (12).
- Remove inlet connection (10) and gasket (13) (not shown).
- Remove throttle valve (7). Remove gasket (14) (not shown).
- If necessary, remove stud (11).
Information System:
C7.1 Industrial Engine
Throttle Valve (Intake Air) - Install
C7.1 Industrial Engine
Temperature Sensor (Cooled Exhaust Gas) - Remove and Install
C7.1 Industrial Engine
Temperature Sensor (DPF) - Remove and Install - Temperature Sensor (DPF) and Flame Detection Sensor
C7.1 Industrial Engine
Soot Antenna - Remove and Install
C7.1 Industrial Engine
Rocker Shaft and Pushrod - Remove
C7.1 Industrial Engine
Rocker Shaft and Pushrod - Install
C7.1 Industrial Engine
Rocker Shaft - Disassemble
C7.1 Industrial Engine
Rocker Shaft - Assemble
C7.1 Industrial Engine
Relay (ARD Nozzle Heater) - Remove and Install - Clean Emissions Module
C7.1 Industrial Engine
Refrigerant Compressor - Remove and Install
C7.1 Industrial Engine
Rear Power Take-Off (RPTO) - Remove
C7.1 Industrial Engine
Rear Power Take-Off (RPTO) - Install
C7.1 Industrial Engine
Turbocharger - Install - First Stage Turbocharger
C7.1 Industrial Engine
Turbocharger - Remove - First Stage Turbocharger
C7.1 Industrial Engine
Turbocharger - Install - Second Stage Turbocharger
C7.1 Industrial Engine
Turbocharger - Remove - Second Stage Turbocharger
C7.1 Industrial Engine
Valve Mechanism Cover - Remove and Install
C7.1 Industrial Engine
Vibration Damper and Pulley - Install
C7.1 Industrial Engine
Vibration Damper and Pulley - Remove
C7.1 Industrial Engine
Wastegate Solenoid - Remove and Install
C7.1 Industrial Engine
Water Pump - Install
C7.1 Industrial Engine
Water Pump - Remove
C7.1 Industrial Engine
Water Temperature Regulator - Remove and Install
C7.1 Industrial Engine
Fuel Priming Pump - Remove and Install - Electric Fuel Lift Pump (EFLP)