Turbocharger - Install - Second Stage Turbocharger
`
1.1. Installation Procedure
Show/hide table
Required Tools | |||
Tool | Part Number | Part Description | Qty |
A | 4C-5597 | Anti-Seize Compound | 1 |
B | 365-8434 | Turbocharger Alignment Tool | 1 |
343-5908 | V-Band Clamp | 1 | |
343-5907 | V-Band Clamp | 1 |
Show/hide table
NOTICE |
---|
Keep all parts clean from contaminants. Contaminants may cause rapid wear and shortened component life. |
- Ensure that turbocharger (8) is clean and free from damage. Inspect the turbocharger for wear. Refer to System Operation, Testing and Adjusting, "Turbocharger Inspect" for more information. If any part of the turbocharger is worn or damaged, the complete turbocharger must be replaced.
- If necessary, follow Step 2.a through Step 2.b in order to install bracket (24) onto cylinder block (25).
- If necessary, install studs (27) (not shown) to the cylinder block. Tighten the studs to a torque of
18 N·m (159 lb in) . - Position bracket (24) onto cylinder block (25). Install nuts (26) hand tight.
- If necessary, install studs (27) (not shown) to the cylinder block. Tighten the studs to a torque of
- If necessary, install studs (23) to turbocharger (8). Tighten the studs to a torque of
18 N·m (159 lb in) .Show/hide tableIllustration 2 g02356216 - Position turbocharger (8) onto bracket (24).
- Loosely install nuts (28).
- Move turbocharger (8) in the Direction (C) to ensure that studs (23) of turbocharger (8) is positioned most forward position in the holes in bracket (24).
- Hand tighten nuts (28).
Show/hide table
Illustration 3 g02352357 Show/hide tableIllustration 4 g02352633 - Use Tooling (B) in order to align the second stage turbocharger and the first stage turbocharger.
Note: Ensure that the bracket for the turbocharger is correctly positioned onto the turbocharger and the cylinder block.
- Tighten nuts (28) to a torque of
44 N·m (32 lb ft) . Tighten the nuts in the sequence that is shown in Illustration 4.Tighten nuts (26) to a torque of
44 N·m (32 lb ft) . Tighten the nuts in the sequence that is shown in Illustration 3. - Remove Tooling (B).
Note: Ensure that the second stage turbocharger and the first stage turbocharger are correctly aligned.
Show/hide tableIllustration 5 g02176246 Show/hide tableIllustration 6 g02176278 - Remove plugs and caps from tube assemblies. Ensure that tube assembly (14) and tube assembly (20) are clean and free from damage. Replace any damaged components.
- Install a new gasket (21) (not shown) onto tube assembly (20).
- Position a new gasket (19) (not shown) onto tube assembly (20).
- Remove the plug from the drain port of the turbocharger. Remove the plug from the cylinder block.
- Position tube assembly (20) into the cylinder block and install bolts (22) finger tight.
- Position tube assembly (20) onto turbocharger (8) and install bolts (18) finger tight.
- Tighten bolts (18) and bolt (22) to a torque of
22 N·m (195 lb in) . - Remove the plug from oil inlet port (29) for turbocharger (8). Lubricate the turbocharger bearings with clean engine oil through oil inlet port (29). Rotate the wheel of the compressor several times in order to lubricate the bearings.
- Position a new gasket (15) (not shown) onto tube assembly (14) and install bolts (13).
Note: Holes in the gasket have serration that hold the bolts captive.
- Position tube assembly (14) onto turbocharger (8). Tighten bolts (13) finger tight.
- Remove plug from cylinder block for the oil feed tube assembly. Install new sealing washers (16) (not shown) and banjo bolt (17) to tube assembly (14). Tighten banjo bolt (17) finger tight.
- Tighten bolts (13) to a torque of
22 N·m (195 lb in) . Tighten banjo bolt (17) to a torque of33 N·m (292 lb in) . Refer to Illustration 5.Show/hide tableIllustration 7 g02176245 - Connect hose assembly (9) onto turbocharger (8) and loosely install bolt (10).
- Use Tooling (A) to lubricate the allen head bolt for V-band clamp (4). Position V-band clamp (4) onto air duct (5).
- Remove plugs from the ports of the turbochargers
- Position hose assembly (12) and air duct (5) onto the outlet of turbocharger (8) and the inlet of turbocharger (3). Tighten the allen head bolt for V-band clamp to a torque of
12 N·m (106 lb in) .Note: Ensure that the allen head bolt for the V-band clamp does not contact any other engine component.
- Tighten hose clamps (11) to a torque of
6 N·m (53 lb in) . - Install bolt (6) (not shown).
- Tighten bolt (10) and bolt (6) (not shown) to a torque of
22 N·m (195 lb in) . - Use Tooling (A) to lubricate the allen head bolt for V-band clamp (2). Position V-band clamp (2) onto elbow (1).
- Use Tooling (A) to lubricate the allen head bolt for V-band clamp (7). Position V-band clamp (7) onto turbocharger (8).
- Position elbow (1) onto turbocharger (8) and turbocharger (3).
- Tighten allen head bolt for V-band clamp (2) and V-band clamp (7) finger tight. Ensure that the V-band clamps are seated correctly onto the turbochargers.
- Tighten allen head bolts for V-band clamp (2) and V-band clamp (7) to a torque of
12 N·m (106 lb in) . - Connect the air inlet hose to the turbocharger and tighten the hose clamp securely.
Show/hide table
![]() | |
Illustration 1 | g02176247 |
End By:
- Install flexible exhaust pipe that connects the turbocharger to the clean emission module. Refer to Disassembly and Assembly, "Flexible Exhaust Pipe - Remove and Install" for the correct procedure.
Information System:
C7.1 Industrial Engine
Turbocharger - Remove - First Stage Turbocharger
C7.1 Industrial Engine
Turbocharger - Install - First Stage Turbocharger
C7.1 Industrial Engine
Throttle Valve (Intake Air) - Remove
C7.1 Industrial Engine
Throttle Valve (Intake Air) - Install
C7.1 Industrial Engine
Temperature Sensor (Cooled Exhaust Gas) - Remove and Install
C7.1 Industrial Engine
Temperature Sensor (DPF) - Remove and Install - Temperature Sensor (DPF) and Flame Detection Sensor
C7.1 Industrial Engine
Soot Antenna - Remove and Install
C7.1 Industrial Engine
Rocker Shaft and Pushrod - Remove
C7.1 Industrial Engine
Rocker Shaft and Pushrod - Install
C7.1 Industrial Engine
Rocker Shaft - Disassemble
C7.1 Industrial Engine
Rocker Shaft - Assemble
C7.1 Industrial Engine
Relay (ARD Nozzle Heater) - Remove and Install - Clean Emissions Module
C7.1 Industrial Engine
Turbocharger - Remove - Second Stage Turbocharger
C7.1 Industrial Engine
Valve Mechanism Cover - Remove and Install
C7.1 Industrial Engine
Vibration Damper and Pulley - Install
C7.1 Industrial Engine
Vibration Damper and Pulley - Remove
C7.1 Industrial Engine
Wastegate Solenoid - Remove and Install
C7.1 Industrial Engine
Water Pump - Install
C7.1 Industrial Engine
Water Pump - Remove
C7.1 Industrial Engine
Water Temperature Regulator - Remove and Install
C7.1 Industrial Engine
Fuel Priming Pump - Remove and Install - Electric Fuel Lift Pump (EFLP)
Cleaning Procedure After a Pump, Motor, or Cylinder Failure for Backhoe Loaders{5050, 7000}
Installation of the 267-8004 Auxiliary Control Wiring Gp {1408}
303.5D CR, 304D CR, 305D CR and 305.5D CR Mini Hydraulic Excavators Machine Systems
System Pressure - Release