1.1. Assembly Procedure

Assembly Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
1P-2420  Transmission Repair Stand 
138-7573  Link Bracket 
1P-1863  Retaining Ring Pliers 
208-6033  Spanner Socket As 
208-6034 Spacer 
138-7574  Link Bracket 
6V-7030  Micrometer Depth Gauge Group 
FT-2770  Leak Down Test Tool 
1U-6396  O-Ring Assembly Compound 
5P-3931  Anti-Seize Compound 
1U-8846  Gasket Sealant 
8T-9206  Duo-Cone Seal Installer As 
5P-3931  Anti-Seize Compound 
235-4848  Drill Fixture Gp 
9S-3263  Thread Lock Compound 

Note: Cleanliness is an important factor. Before assembly, all parts should be thoroughly cleaned in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts. Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If any parts are worn or damaged, use new parts for replacement. All disassembly and all assembly procedures must be performed on a clean work surface and in a clean hydraulic area. Keep cleaned parts covered and protected at all times.

Note: O-ring seals, gaskets, and seals should always be replaced. A used O-ring seal may not have the same sealing properties as a new O-ring. Use Tooling (K) during the assembly procedure.

Note: Apply a light film of hydraulic oil to all components before assembly.

Note: Some of the images that are in this procedure do not show the sprocket assembly that is attached to the final drive housing. If necessary, the weights that are given include the weight of the sprocket assembly.



    Illustration 1g01147975

  1. Apply Tooling (P) to the outer diameter of the bearings.

  2. Use a suitable press to Install bearings (40) and (41). Make sure that bearing (41) and bearing (40) contact the counterbore in housing (36).

  3. Use Tooling (N) to install Duo-Cone seal (39B).


    Illustration 2g01147981

  4. Use Tooling (N) to install Duo-Cone seal (39A) onto housing (38).


    Illustration 3g01147930

  5. Use Tooling (E) and a suitable lifting device to install housing (36) onto housing (38). The weight of housing (36) is approximately 100 kg (220 lb).

  6. Remove Tooling (E) from housing (36).


    Illustration 4g01147724

  7. Install stopper plate (35). Do not tighten stopper plate assembly (35) at this time.

    Note: Stopper plate (35) will secure housing (36) to housing (38).

  8. Install Tooling (E) and a suitable lifting device to housing (36). The combined weight of housing assembly (36) and (38) is approximately 120 kg (265 lb). Install housing assembly (36) and (38) in a suitable press.

  9. Remove stopper plate (35).


    Illustration 5g01147727

  10. Assemble Tooling (D), as shown.


    Illustration 6g01147731

  11. Install Tooling (D) into housing (36), as shown.

  12. Apply a force of 4000 kg (8818 lb) to the top of Tooling (D). Rotate housing (36) to seat the bearings.

  13. Reduce the force on the top of Tooling (D) to 3000 kg (6615 lb).


    Illustration 7g01147737

  14. Use Tooling (H) to take a measurement in three locations. Average the three measurements and record the average measurement as Dimension (W).

  15. Remove Tooling (D).

  16. Separate Tooling (D).


    Illustration 8g01147743

  17. Use a micrometer to measure the thickness at three locations of the spacer from Tooling (D). Record the average measurement as Dimension (X).


    Illustration 9g01147742

  18. Use a micrometer to measure the thickness at three locations of stopper plate (35). Record the average measurement as Dimension (Y).

  19. Subtract Dimension (X) from Dimension (Y) and record this figure as Dimension (Z).


    Illustration 10g01147724

  20. Install stopper plate (35) onto housing (38). Do not tighten stopper plate (35) at this time. Stopper plate (35) will secure the final drive assembly while the final drive assembly is repositioned onto Tooling (A).

  21. Use Tooling (E) and a suitable lifting device to reposition the final drive assembly onto Tooling (A). The combined weight of housing assembly (36) and (38) is approximately 120 kg (265 lb).

  22. Secure the final drive assembly to Tooling (A).


    Illustration 11g01148004

  23. Secure the spanner socket from Tooling (D) to stopper plate (35).

  24. to determine the final bearing preload, add Dimension (W) to Dimension (Z) and record this figure as Dimension (V).

  25. Use Tooling (H) to measure the distance in three locations.

  26. Tighten stopper plate (35) until the average of the measurements is equal to Dimension (V).

  27. Remove Tooling (D).


    Illustration 12g01372092

  28. Install Tooling (Q) and a suitable vacuum onto stopper plate (35).


    Illustration 13g01147789

  29. Use a suitable drill and Tooling (Q) to drill a hole to the depth of 15 mm (0.6 inch) in the stopper plate and in housing (38).


    Illustration 14g01147796

  30. Install dowel (37).


    Illustration 15g01147650

  31. Apply Tooling (R) to bolts (35A). Install plate (35B) and bolts (35A).

  32. Repeat Steps 28 through 31 for the opposite side of stopper plate (35).


    Illustration 16g00781807

  33. Install O-ring seal (34) on housing (36).


    Illustration 17g00781730

  34. Install gear (33) on housing (36).


    Illustration 18g00781719

  35. Assemble carrier assembly (27), as follows.


      Illustration 19g00781607

    1. Use a deburring tool to remove the metal burr from the openings in the carrier.

    2. Install two bearings (31) in planetary gear (32).

    3. Install thrust washers (30) and planetary gear (32) in the carrier assembly.

    4. Install planetary shaft (28) in the carrier assembly.

    5. Align the split in spring pin (29) to the top or to the bottom. Make a stake mark on each side of the spring pin hole in the carrier. Each stake mark should be approximately 1.50 mm (0.059 inch) from the outside diameter of the spring pin hole.


      Illustration 20g00903073

    6. Drive spring pin (29) into planetary shaft (28) with a hammer and a punch.

  36. Repeat Steps 35.a through 35.e to install the other two planetary gears in the carrier.


    Illustration 21g00781559

  37. Use two people to install carrier assembly (27) in gear (33). The weight of carrier assembly (27) is approximately 38 kg (85 lb).


    Illustration 22g00781529

  38. Install spacer (26). Install gear (25).


    Illustration 23g01148010

  39. Assemble carrier assembly (19), as follows.


      Illustration 24g00781516

    1. Use a deburring tool to remove the metal burr from the openings in the carrier.

    2. Install bearing (23) in planetary gear (24).

    3. Install thrust washers (22) and planetary gear (24) in the carrier assembly.

    4. Install planetary shaft (21) in the carrier assembly.


      Illustration 25g00903073

    5. Drive spring pin (20) into planetary shaft (21) with a hammer and a punch.


      Illustration 26g00879368

    6. Align the split in the spring pin to the top or to the bottom. Make a stake mark on each side of the spring pin hole in the carrier. Each stake mark should be approximately 1.50 mm (0.059 inch) from the outside diameter of the spring pin hole.

    7. Repeat Steps 39.a through 39.f to install the other two planetary gears in the carrier.


    Illustration 27g01148011

  40. Install carrier assembly (19) into gear (33).

  41. Install retaining ring (18).


    Illustration 28g00781412

  42. Install spacer (17). Install gear (16).


    Illustration 29g01389598

    Note: Make sure that the oil passages in the shafts are oriented toward the center of carrier assembly (15).

  43. Raise the temperature of carrier assembly (15). Lower the temperature of the shafts. Install the shafts into carrier assembly (15) until the groove of the shafts is at Dimension (A). Dimension (A) equals 25.00 ± 0.10 mm (0.984 ± 0.004 inch).

  44. Make eight stake marks at distance of Dimension (C) from each shaft. Dimension (C) equals 2.0 ± 1.0 mm (0.08 ± 0.04 inch). The width of each stake mark should be equal to Dimension (B). Dimension (B) equals 4.0 ± 1.0 mm (0.16 ± 0.04 inch).


    Illustration 30g00781407

  45. Assemble carrier assembly (15), as follows.

    1. Install carrier assembly in position on gear (16).


      Illustration 31g00781401

    2. Install retaining ring (14) onto gear (16).


      Illustration 32g00780432

    3. Install washer (11). Install bearing assembly (13). Install gear (12). Install washer (11). Install retaining ring (10) with Tooling (C).

    4. Repeat Steps 45.a through 45.c for the other two planetary gears.


    Illustration 33g00780428

  46. Install spacer (9). Install gear (8).


    Illustration 34g00879365

  47. Install O-ring seal (7) on plugs (4).


    Illustration 35g00879362

  48. Install plugs (4) and spacer (6) in cover (2).

  49. Position gear (5). Install bolts (3).


    Illustration 36g00708090


    Illustration 37g00708089

  50. Place a piece of solder in the center of gear (8).

    Note: You may need to apply some grease to the solder to keep the solder in position on gear (8).

  51. Use Tooling (B) and a suitable lifting device to Install cover (2). The weight of cover (2) is approximately 32 kg (70 lb).

  52. Install four bolts (1) at 90 degrees from each other. Tighten bolts (1) in a crisscross pattern to a torque of 420 ± 60 N·m (310 ± 44 lb ft). Turn bolts (1) anadditional60 ± 5 degrees.

  53. Remove bolts (1).

  54. Use Tooling (B) and a suitable lifting device to remove cover (2). The weight of cover (2) is approximately 32 kg (70 lb).

  55. Use a micrometer to measure the thickness of the solder. Record this measurement to determine the thickness of the shims for plate (6). Adjust the shims to obtain a clearance of 1.000 + 1.000 mm (0.0394 + 0.0394 inch) between plate (6) and gear (8).

  56. Apply Tooling (M) to the mating surfaces of cover (2) and the housing.

  57. Use Tooling (B) and a suitable lifting device to Install cover (2). The weight of cover (2) is approximately 32 kg (70 lb).

  58. Apply Tooling (R) to bolts (1). Install bolts (1) and the washers. Tighten bolts (1) in a crisscross pattern to a torque of 900 ± 100 N·m (664 ± 74 lb ft).


    Illustration 38g00783362

  59. Remove plug (4) (not shown). Attach Tooling (J) to cover (2). Reduce the air pressure at the source to 103 kPa (15 psi). Apply air pressure to Tooling (J). This air will test the Duo-Cone seals.

  60. Use the ball valve on Tooling (J) to eliminate the air pressure to the final drive. A pressure of 98 kPa (14.2 psi) must be maintained for 30 seconds.

  61. Remove Tooling (J). Install plug (6). Torque plug (6) to 80 ± 10 N·m (59 ± 7 lb ft).

  62. Remove the final drive from Tooling (A). The weight of the final drive assembly is approximately 310 kg (683 lb).

End By:

  1. If necessary, install the final drive sprocket. Refer to Disassembly and Assembly, "Final Drive Sprocket - Remove and Install".

  2. Install the final drive. Refer to Disassembly and Assembly, "Final Drive - Install".

Information System:

330D, 336D, 336D2, 340D and 340D2 Excavators and 336D MHPU Mobile Hydraulic Power Unit Machine Systems Final Drive - Disassemble - Type-One
330F MHPU Mobile Hydraulic Power Unit Fuel System Secondary Filter - Replace
320E Excavator Fuel System Primary Filter (Water Separator) Element - Replace
Removal, Installation, and Conditioning of Idler Bearings and Track Roller Bearings {4159, 4159, 4180, 4180, 7551}
349E Excavator Hydraulic System Stick Hydraulic System
450E Backhoe Loader Machine Electronic Control System Wiring Harness (Short Circuit) - Test
450E Backhoe Loader Machine Electronic Control System Backup Alarm Always Off
450E Backhoe Loader Machine Electronic Control System Charging System
450E Backhoe Loader Machine Electronic Control System Switch Circuits
450E Backhoe Loader Machine Electronic Control System Electrical Output Components
450E Backhoe Loader Machine Electronic Control System Location of Electrical Components
450E Backhoe Loader Machine Electronic Control System Diagnostic Code List
2011/11/07 The Swing Bearing In the Bearing And Gear Group Is Improved on Certain 330D, 345C and 345D Excavators and 345C and 345D Mobile Hydraulic Power Units {7063}
2012/11/30 New Crankshaft for the C6.6 Machine Engines {1202}
Procedure to Adjust Track Tension with Restricted Access to Fill Valve{7050}
824K Wheel Dozer, 825K Soil Compactor and 826K Landfill Compactor Machine Systems Oil Filter (Hydraulic)
390D Excavator Lifting Capacities - 390D L
Procedure to Salvage Tang Slots on Transmission and Brake Pistons {0679, 3160, 4011, 4251}
345C MHPU Mobile Hydraulic Power Unit Hydraulic System Combined Function Hydraulic System - System 17
330F MHPU Mobile Hydraulic Power Unit Radiator Core - Clean
345C MHPU Mobile Hydraulic Power Unit Hydraulic System Work Tool Parameter - Default Values - System 17
VT-30, VT-40, VT-50 and VT-60 Multi-Processors Safety Messages
345C MHPU Mobile Hydraulic Power Unit Hydraulic System Relief Valve (Auxiliary) - Test and Adjust - Line, System 17
345C MHPU Mobile Hydraulic Power Unit Hydraulic System Relief Valve (Auxiliary) - Test and Adjust - Main (Medium Pressure), System 17