303.5D CR, 304D CR, 305D CR and 305.5D CR Mini Hydraulic Excavators Machine Systems Main Control Valve - Assemble Caterpillar


Main Control Valve - Assemble
`
1.1. Assembly Procedure

Assembly Procedure

Note: Cleanliness is an important factor. Thoroughly clean all parts in cleaning fluid before assembly. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts. Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If any parts are worn or damaged, use new parts for replacement.




    Illustration 1g01225240

  1. Install check valve (80) and check valve (79) into inlet control valve (73) .

  1. Install plug (78) and the O-ring seal into inlet control valve (73) .

  1. Install O-ring seal (77) and O-ring seal (76) into inlet control valve (73). Install O-ring seal (75) into inlet control valve (73) .



    Illustration 2g01225230

  1. Install rods (74) into inlet control valve (73) .



    Illustration 3g01225226

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.

    ----------------------

  1. Refer to Step 44 and refer to Step 45 for travel control valve (72) .

  1. Refer to Step 48 through Step 51 for travel control valve (72) .

  1. Position travel control valve (72) onto the valve bank.

  1. Refer to Step 53 for travel control valve (72). Install plate (71) onto travel control valve (72) .



    Illustration 4g01225223

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.

    ----------------------

  1. Refer to Step 44 and refer to Step 45 for travel control valve (70) .

  1. Refer to Step 48 through Step 51 for travel control valve (70) .

  1. Position travel control valve (70) onto the valve bank.

  1. Refer to Step 53 for travel control valve (70). Install plate (69) onto travel control valve (70) .



    Illustration 5g01224411

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.

    ----------------------

  1. Refer to Step 44 and refer to Step 45 for blade control valve (68) .

  1. Refer to Step 48 through Step 51 for blade control valve (68) .

  1. Position blade control valve (68) onto the valve bank.

  1. Refer to Step 53 for blade control valve (68). Install plate (67) onto blade control valve (68) .



    Illustration 6g01224379

  1. Refer to Step 44 and refer to Step 45 for boom control valve (48) .

  1. Install check valve (66) and check valve (65) onto boom control valve (48) .



    Illustration 7g01224354

  1. Install check valve (64) onto housing (57) .



    Illustration 8g01224337

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.

    ----------------------

  1. Install the following items into boom control valve (48) : washer (63), spring (62), spring retainer (61), O-ring seal (60), O-ring seal (59), O-ring seal (58), housing (57) and bolts (56) .



    Illustration 9g01224028

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.

    ----------------------

  1. Install the following items into boom control valve (48) : spool (49), washer (50), spring (51) and spring retainer (52) .

  1. Install O-ring seal (53) onto cap (55) .

  1. Position cap (55) onto boom control valve (48) and install bolts (54) .



    Illustration 10g01223988

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.

    ----------------------

  1. Position boom control valve (48) onto the valve bank.

  1. Refer to Step 53 for boom control valve (48). Install plate (47) onto boom control valve (48) .



    Illustration 11g01223929

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.

    ----------------------

  1. Refer to Step 44 and refer to Step 45 for work tool control valve (46) .

  1. Refer to Step 48 through Step 51 for work tool control valve (46) .

  1. Position work tool control valve (46) onto the valve bank.

  1. Refer to Step 53 for work tool control valve (46). Install plate (45) onto work tool control valve (46) .



    Illustration 12g01223839

  1. Refer to Step 44 and refer to Step 45 for bucket control valve (42) .

  1. Install check valve (44) and install check valve (43) onto bucket control valve (42) .

  1. Refer to Step 48 through Step 51 for bucket control valve (42) .



    Illustration 13g01223814

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.

    ----------------------

  1. Position bucket control valve (42) onto the valve bank.

  1. Refer to Step 53 for bucket control valve (42). Install plate (41) onto bucket control valve (42) .



    Illustration 14g01223654

  1. Refer to Step 44 and refer to Step 45 for stick control valve (38) .

  1. Install check valve (40) and check valve (39) onto stick control valve (38) .

  1. Refer to Step 48 through Step 51 for stick control valve (38) .



    Illustration 15g01223566

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.

    ----------------------

  1. Position stick control valve (38) onto the valve bank.

  1. Refer to Step 53 for stick control valve (38). Install plate (37) onto stick control valve (38) .



    Illustration 16g01223561

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.

    ----------------------

  1. Refer to Step 44 and refer to Step 45 for swing control valve (36) .

  1. Refer to Step 48 through Step 51 for swing control valve (36) .

  1. Position swing control valve (36) onto the valve bank.

  1. Refer to Step 53 for swing control valve (36). Install plate (35) onto swing control valve (36) .



    Illustration 17g01224420

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.

    ----------------------

  1. Install piston (33) and spring (34). Install O-ring seal (32) .



    Illustration 18g01223610

  1. Position flange (31) onto the control valve and install bolts (30) .



    Illustration 19g01223583

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.

    ----------------------

  1. Install the following items into the control valve: backup ring (25), O-ring seal (26), poppet (24), spring (27), O-ring seal (28) and cap (29) .



    Illustration 20g01223535

  1. Install O-ring seal (23) onto adjuster (22). Install adjuster (22) into boom swing control valve (9) .



    Illustration 21g01223514

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.

    ----------------------

  1. Install spool (15) into the control valve.

  1. Install the following items into the control valve: washer (16), spring (17) and spring retainer (18).

  1. Install O-ring seal (19) onto cap (21). position cap (21) onto the control valve and install bolts (20) .

  1. Refer to Step 49 and refer to Step 50 for the opposite side.

  1. Position boom swing control valve (9) onto the valve bank.



    Illustration 22g01223498

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.

    ----------------------

  1. Install the following items onto the control valve: O-ring seal (14), pistons (13), springs (12), O-ring seal (11) and O-ring seal (10) .



    Illustration 23g01223489

  1. Install the following items onto outlet control valve (3) : fitting (8), fitting (7), fitting (6), pressure switch (5) and fitting (4) .



    Illustration 24g01223392

  1. Position outlet control valve (3) onto the valve bank. Install nuts (2) .



    Illustration 25g01223390

  1. Install tube assembly (1) onto the valve bank.

End By: Install the main control valve. Refer to , "Main Control Valve - Install".

Information System:

303.5D CR, 304D CR, 305D CR and 305.5D CR Mini Hydraulic Excavators Machine Systems Main Control Valve - Disassemble
303E CR, 303.5E, 304E, 305.5E and 305E Mini Hydraulic Excavators Machine Systems Pilot Valve (Travel) - Install
303.5D CR, 304D CR, 305D CR and 305.5D CR Mini Hydraulic Excavators Machine Systems Pilot Valve (Travel) - Remove
303.5D CR, 304D CR, 305D CR and 305.5D CR Mini Hydraulic Excavators Machine Systems Control Manifold (Pilot Oil) - Assemble - Hydraulic Lockout, Swing Brake and Travel
303.5D CR, 304D CR, 305D CR and 305.5D CR Mini Hydraulic Excavators Machine Systems Control Manifold (Pilot Oil) - Disassemble - Hydraulic Lockout, Swing Brake and Travel
C9.3 Engines for Caterpillar Built Machines Electrical Power Supply - Test
303.5D CR, 304D CR, 305D CR and 305.5D CR Mini Hydraulic Excavators Machine Systems Main Hydraulic Pump - Assemble
303E CR, 303.5E, 304E, 305.5E and 305E Mini Hydraulic Excavators Machine Systems Main Hydraulic Pump - Disassemble
C9.3 Engines for Caterpillar Built Machines Sensor Supply - Test
S365C and S385C Demolition and Scrap Shears Specifications
303.5D CR, 304D CR, 305D CR and 305.5D CR Mini Hydraulic Excavators Machine Systems Main Hydraulic Pump - Remove
303.5D CR, 304D CR, 305D CR and 305.5D CR Mini Hydraulic Excavators Machine Systems Swing Motor and Swing Drive - Assemble
303.5D CR, 304D CR, 305D CR and 305.5D CR Mini Hydraulic Excavators Machine Systems Hydraulic Track Adjusters - Remove and Install
303.5D CR, 304D CR, 305D CR and 305.5D CR Mini Hydraulic Excavators Machine Systems Pilot Valve (Blade) - Disassemble
303.5D CR, 304D CR, 305D CR and 305.5D CR Mini Hydraulic Excavators Machine Systems Pilot Valve (Blade) - Assemble
Product Link - PL522/523 System Components
Product Link - PL522/523 Configuration
303.5D CR, 304D CR, 305D CR and 305.5D CR Mini Hydraulic Excavators Machine Systems Front Idler - Remove and Install
303.5D CR, 304D CR, 305D CR and 305.5D CR Mini Hydraulic Excavators Lifting Capacities
C9.3 Engines for Caterpillar Built Machines Sensor Calibration Required - Test
C15 and C18 Tier 4 Final Engines Engine Oil Pressure - Test
303.5E2, 304E2, 305E2 and 305.5E2 Mini Excavator Machine Systems Track Carrier Roller - Remove and Install
Product Link - PL522/523 Installation Parameters Configure
S365C and S385C Demolition and Scrap Shears Declaration of Conformity